Building Construction — Antrim, Michigan
WD MI20260106-15442-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Antrim, Michigan (construction type: building) is $40.00/hr base + $23.65/hr fringe = $63.65/hr total package (WD MI20260106-15442-bld, Rev. 1).
Scroll down for all 38 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 Above median +190% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $43.50 | $37.64 | $81.14 Above median +154% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $35.83 | $22.18 | $58.01 Above median +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $30.83 | $21.09 | $51.92 +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $20.75 | $5.82 | $26.57 -7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $19.12 | $4.91 | $24.03 -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $17.19 | $3.83 | $21.02 -25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $25.02 | $13.45 | $38.47 +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $13.55 | $3.55 | $17.10 Above median -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 Top 10% -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 Above median +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $40.04 | $26.47 | $66.51 Above median +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $24.04 | $6.03 | $30.07 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $24.04 | $6.03 | $30.07 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH ONLY | $16.20 | $2.07 | $18.27 Above median -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: ROLLER | $16.61 | $2.09 | $18.70 -21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY | $16.37 | $2.08 | $18.45 -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $38.01 | $21.73 | $59.74 +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $38.01 | $21.73 | $59.74 Above median +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER.$ 38.01 21.73 PIPEFITTER | $38.01 | $21.73 | $59.74 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR L | $47.28 | $25.25 | $72.53 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR W | $43.93 | $25.25 | $69.18 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANE; PAVER; AND SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR AB | $41.28 | $25.25 | $66.53 +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERAT | $39.57 | $25.25 | $64.82 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERAT | $33.71 | $25.25 | $58.96 Above median +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WI | $31.23 | $25.25 | $56.48 Top 10% +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $13.64 | $4.58 | $18.22 -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $31.05 | $25.07 | $56.12 +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $41.34 | $27.39 | $68.73 +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $35.83 | $22.18 | $58.01 Above median +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $16.56 | $3.50 | $20.06 Top 10% -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLATBED TRUCK | $17.44 | $4.51 | $21.95 Above median -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Antrim, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Antrim
Compliance Notes
- This wage determination applies to federal contracts for building construction in Antrim, Michigan.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.