Building Construction — Antrim, Michigan

WD MI20260106-15442-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Antrim, Michigan (construction type: building) is $40.00/hr base + $23.65/hr fringe = $63.65/hr total package (WD MI20260106-15442-bld, Rev. 1).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: MI20260106-15442-bld
Revision: 1
Construction Type: building
State: Michigan (MI)
County: Antrim
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference MI20260106View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65 Above median +190% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.50 $37.64 $81.14 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $35.83 $22.18 $58.01 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $30.83 $21.09 $51.92 +76% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.75 $5.82 $26.57 -7% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.12 $4.91 $24.03 -31% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $17.19 $3.83 $21.02 -25% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $29.51 $66.06 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $29.51 $66.06 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER $25.02 $13.45 $38.47 +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.55 $3.55 $17.10 Above median -27% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $11.04 $4.39 $15.43 Top 10% -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SANDBLASTER $26.23 $13.45 $39.68 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $40.04 $26.47 $66.51 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $24.04 $6.03 $30.07 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $22.46 $7.29 $29.75 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $24.04 $6.03 $30.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $27.47 $8.86 $36.33 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $19.60 $7.31 $26.91 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY $16.20 $2.07 $18.27 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $16.61 $2.09 $18.70 -21% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $16.37 $2.08 $18.45 -22% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $38.01 $21.73 $59.74 +61% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $38.01 $21.73 $59.74 Above median +61% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER.$ 38.01 21.73 PIPEFITTER $38.01 $21.73 $59.74 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR L $47.28 $25.25 $72.53 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE, GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR W $43.93 $25.25 $69.18 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CRANE; PAVER; AND SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR AB $41.28 $25.25 $66.53 +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERAT $39.57 $25.25 $64.82 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERAT $33.71 $25.25 $58.96 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WI $31.23 $25.25 $56.48 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.64 $4.58 $18.22 -33% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $31.05 $25.07 $56.12 +89% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $41.34 $27.39 $68.73 +86% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $35.83 $22.18 $58.01 Above median +126% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $16.56 $3.50 $20.06 Top 10% -24% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $17.44 $4.51 $21.95 Above median -17% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Antrim, MI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Antrim

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260106-15442-bld →