Heavy Construction — Alpena, Michigan

WD MI20260042-15441-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Alpena, Michigan (construction type: heavy) is $35.86/hr base + $23.69/hr fringe = $59.55/hr total package (WD MI20260042-15441-hvy, Rev. 1).

Scroll down for all 32 trade classifications covered by this determination.

WD Number: MI20260042-15441-hvy
Revision: 1
Construction Type: heavy
State: Michigan (MI)
County: Alpena
Effective: May 17, 2026
Trades covered: 32
Official source: SAM.gov reference MI20260042View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $35.86 $23.69 $59.55 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $25.47 $12.38 $37.85 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.10 $12.38 $35.48 Above median +25% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ALPENA, CRAWFORD; IOSCO, MONTMORENCY, OGEMAW, OSCODA, OTSEGO & PRESQUE ISLE COUNTIES) $37.75 $25.60 $63.35 +81% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CRAWFORD, OTSEGO & ROSCOMMON COUNTIES) $36.62 $23.05 $59.67 +71% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (IOSCO, OGEMAW & ROSCOMMON COUNTIES) $40.00 $26.52 $66.52 +90% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.55 $33.37 $69.92 Above median +128% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $36.55 $35.93 $72.48 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( COMMON OR GENERAL) $22.42 $12.95 $35.37 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( GRADE CHECKER) $22.73 $12.95 $35.68 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON 3.323OR GENERAL $23.32 $13.45 $36.77 +57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $25.02 $13.45 $38.47 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $27.68 $13.45 $41.13 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $10.89 $1.74 $12.63 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $15.97 $3.51 $19.48 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $15.28 $3.99 $19.27 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $12.98 $6.12 $19.10 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.50 $3.62 $19.12 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.07 $8.37 $24.44 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: C $48.98 $25.25 $74.23 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE $45.68 $25.25 $70.93 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 $41.32 $25.25 $66.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 5 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER $32.98 $25.25 $58.23 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT:EXCLUDES UNDERGROUND CONSTRUCTION GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; COMPACTOR; CRANE; SCRAPER FOOTNOTES: CRANE OPERATOR $44.00 $25.25 $69.25 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.74 $7.93 $21.67 Above median $0.00 $0.00 $0.00 $0.00
PLUMBER $43.50 $21.10 $64.60 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER $45.98 $25.25 $71.23 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 2 TRENCHER $41.25 $25.25 $66.50 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 3 BOOM TRUCK $40.52 $25.25 $65.77 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR $39.95 $25.25 $65.20 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.10 $1.25 $12.35 -53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.55 $0.75 $34.30 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Alpena, MI — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Alpena

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MI20260042-15441-hvy →