Building Construction — Worcester, Massachusetts

WD MA20260013-15425-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Worcester, Massachusetts (construction type: building) is $49.10/hr base + $36.63/hr fringe = $85.73/hr total package (WD MA20260013-15425-bld, Rev. 1).

Scroll down for all 16 trade classifications covered by this determination.

WD Number: MA20260013-15425-bld
Revision: 1
Construction Type: building
State: Massachusetts (MA)
County: Worcester
Effective: May 17, 2026
Trades covered: 16
Official source: SAM.gov reference MA20260013View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $49.10 $36.63 $85.73 Above median +212% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $62.36 $36.80 $99.16 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.12 $34.51 $70.63 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.16 $36.20 $84.36 Top 10% +114% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA $66.41 $38.44 $104.85 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $57.57 $37.67 $95.24 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $39.84 $12.04 $51.88 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK $38.95 $29.81 $68.76 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $46.26 $36.00 $82.26 Top 10% +206% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $55.00 $31.57 $86.57 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2: BULLDOZER $57.18 $33.70 $90.88 +160% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1B BACKHOE/EXCAVATOR/TRACKHOE, LOADER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY $57.83 $33.70 $91.53 +162% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $53.53 $35.69 $89.22 Top 10% +156% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $43.48 $36.46 $79.94 Above median +110% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $49.32 $35.26 $84.58 Top 10% $0.00 $0.00 $0.00 $0.00
TILE SETTER $64.52 $37.51 $102.03 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Worcester, MA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Worcester

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MA20260013-15425-bld →