Highway Construction — Norfolk, Massachusetts

WD MA20260022-15424-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Norfolk, Massachusetts (construction type: highway) is $43.64/hr base + $22.09/hr fringe = $65.73/hr total package (WD MA20260022-15424-hwy, Rev. 1).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: MA20260022-15424-hwy
Revision: 1
Construction Type: highway
State: Massachusetts (MA)
County: Norfolk
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference MA20260022View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $43.64 $22.09 $65.73 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $56.70 $21.08 $77.78 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $66.17 $37.08 $103.25 Top 10% +162% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $44.52 $19.36 $63.88 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND STRUCTURAL $57.87 $37.67 $95.54 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
LABORER $38.95 $29.70 $68.65 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $33.65 $17.32 $50.97 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $38.95 $29.70 $68.65 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $44.43 $14.18 $58.61 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SURFACER $46.20 $29.85 $76.05 +153% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FENCE ERECTION $38.95 $29.70 $68.65 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER: JACK HAMMER $38.69 $17.33 $56.02 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $64.67 $0.00 $64.67 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $48.74 $11.79 $60.53 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $42.56 $17.34 $59.90 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $47.30 $6.42 $53.72 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: STEEL $56.76 $36.00 $92.76 Top 10% +245% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; PAVER; POST DRIVER FOOTNOTE $57.83 $33.70 $91.53 +162% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; MILLING MACHINE; ROLLER $57.18 $33.70 $90.88 +160% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL $57.83 $33.70 $91.53 +162% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $23.00 $20.44 $43.44 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $53.35 $12.78 $66.13 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: CONCRETE TRUCK $33.69 $15.79 $49.48 Bottom 10% +70% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $37.74 $11.86 $49.60 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $48.53 $0.00 $48.53 Top 10% +66% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Norfolk, MA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Norfolk

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MA20260022-15424-hwy →