Highway Construction — Hampden, Massachusetts

WD MA20260019-15436-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Hampden, Massachusetts (construction type: highway) is $33.03/hr base + $20.02/hr fringe = $53.05/hr total package (WD MA20260019-15436-hwy, Rev. 1).

Scroll down for all 23 trade classifications covered by this determination.

WD Number: MA20260019-15436-hwy
Revision: 1
Construction Type: highway
State: Massachusetts (MA)
County: Hampden
Effective: May 17, 2026
Trades covered: 23
Official source: SAM.gov reference MA20260019View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $33.03 $20.02 $53.05 Top 10% +55% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $52.13 $20.89 $73.02 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $47.13 $13.41 $60.54 Above median +53% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $46.21 $21.27 $67.48 Top 10% +20% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND STRUCTURAL $41.89 $33.90 $75.79 Top 10% +35% vs market $0.00 $0.00 $0.00 $0.00
LABORER $35.00 $26.91 $61.91 Above median +106% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $33.10 $18.09 $51.19 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $44.43 $14.18 $58.61 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $44.11 $18.85 $62.96 Top 10% +110% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $51.63 $0.00 $51.63 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $48.14 $17.02 $65.16 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $43.87 $18.04 $61.91 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $38.30 $17.43 $55.73 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: STEEL $56.76 $36.00 $92.76 Top 10% +245% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; LOADER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOL $57.18 $33.70 $90.88 +160% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 BROOM/SWEEPER; CRANE; GRADALL; POST DRIVER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY $57.18 $33.70 $90.88 +160% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHD $57.83 $33.70 $91.53 +162% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 MILLING MACHINE; PAVER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDA $57.83 $33.70 $91.53 +162% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 ROLLER FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, ME $39.12 $31.04 $70.16 +100% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $43.73 $15.06 $58.79 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: CONCRETE TRUCK $33.69 $15.79 $49.48 Bottom 10% +70% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $43.81 $5.39 $49.20 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $48.53 $0.00 $48.53 Top 10% +66% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hampden, MA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hampden

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MA20260019-15436-hwy →