Residential Construction — Franklin, Massachusetts

WD MA20260011-15435-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Franklin, Massachusetts (construction type: residential) is $50.62/hr base + $28.82/hr fringe = $79.44/hr total package (WD MA20260011-15435-res, Rev. 1).

Scroll down for all 56 trade classifications covered by this determination.

WD Number: MA20260011-15435-res
Revision: 1
Construction Type: residential
State: Massachusetts (MA)
County: Franklin
Effective: May 17, 2026
Trades covered: 56
Official source: SAM.gov reference MA20260011View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $50.62 $28.82 $79.44 Above median $0.00 $0.00 $0.00 $0.00
BRICKLAYERS; CEMENT MASONS; PLASTERERS; STONE MASONS; MARBLE, TILE & TERRAZZO WORKERS $50.81 $32.27 $83.08 +83% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: ALL OTHER WORK (FRANKLIN) $43.33 $27.82 $71.15 +108% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS (FRANKLIN) $43.33 $27.82 $71.15 +108% vs market $0.00 $0.00 $0.00 $0.00
CARPENTRY WORK ON WOOD FRAME PROJECTS) $26.55 $13.02 $39.57 $0.00 $0.00 $0.00 $0.00
DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 Y $41.14 $37.35 $78.49 Top 10% $0.00 $0.00 $0.00 $0.00
DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 Y $41.02 $37.35 $78.37 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $52.16 $29.56 $81.72 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA $66.41 $38.44 $104.85 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
ERECTORS, SIGN ERECTORS, ASBESTOS REMOVAL LABORERS LABORERS: GROUP 2 ASPHALT RAKERS, CARBIDE CORE DRILLER OPERATORS, CHAIN SAW OPERATORS, PIPELAYERS $32.75 $26.02 $58.77 $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $43.23 $27.79 $71.02 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
FRAMING, SIDING AND EXTERIOR TRIM WORK) $26.55 $13.02 $39.57 $0.00 $0.00 $0.00 $0.00
INCHES; POWER HEATERS; OILER; A-FRAME TRUCKS; FORKLIFTS-UP TO 7 FT. LIFT AND UP TO 3 TON CAPACITY; HYDRO BROOM; STUD WELDER. HAZARDOUS WASTE PREMIUM $ $52.73 $30.58 $83.31 $0.00 $0.00 $0.00 $0.00
INSULATOR/ASBESTOS WORKER $44.36 $36.63 $80.99 Above median +195% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $41.89 $33.90 $75.79 Above median +35% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 LABORERS, CARPENTER TENDERS, WRECKING LABORERS (FRANKLIN) $32.50 $26.02 $58.52 +95% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS (FRANKLIN) $38.95 $29.70 $68.65 +129% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENMDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL $38.95 $29.70 $68.65 +129% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER;HYDRAULIC & SIMILAR SELF POWERED DRILLS (FRANKLIN) $38.95 $29.70 $68.65 +129% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 PRECAST FLOOR AND ROOF PLANK ERECTORS, SIGN ERECTORS, ASBESTOS REMOVAL LABORERS (FRANKLIN) $33.25 $26.02 $59.27 +97% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 AIR TRACK OPERATORS, BLOCK PAVERS, RAMMERS AND CURB SETTERS (FRANKLIN) $33.25 $26.02 $59.27 +97% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 BLASTER; POWDERMAN (FRANKLIN) $38.95 $29.70 $68.65 +129% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 5 FLAGGER (FRANKLIN) $38.95 $29.70 $68.65 +129% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 5 POWDERMAN AND BLASTER (FRANKLIN) $33.50 $26.02 $59.52 +98% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 6 ASBESTOS ABATEMENT, TOXIC AND HAZARDOUS WASTE LABORERS (FRANKLIN) $38.95 $29.70 $68.65 +129% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER $46.25 $29.70 $75.95 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS $47.00 $29.70 $76.70 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC ""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS $47.25 $29.70 $76.95 Top 10% +156% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 4 YARDMAN $42.25 $29.70 $71.95 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS $45.35 $29.70 $75.05 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE $46.25 $29.70 $75.95 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
LIFT AND OVER 3 TON CAPACITY; SCRAPER 21 YDS AND OVER; SONIC HAMMER CONSOLE; RECLAIMERS ROAD PLANER/MILLING MACHINE; CAL TRACKS; BALLAST REGULATORS; R $40.92 $30.58 $71.50 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, TAPER $38.08 $31.85 $69.93 Bottom 10% +160% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY, SANDBLAST $39.48 $31.85 $71.33 Bottom 10% +166% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER (FRANKLIN) $55.00 $31.57 $86.57 +116% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER (FRANKLIN) FOOTNOTE FOR PLUMBERS & STEAMFITTERS: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE HAS B $52.26 $31.05 $83.31 +108% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 SHOVELS; CRAWLERS AND TRUCK CRANES INCLUDING ALL TOWER; SELF-PROPELLED HYDRAULIC CRANES 10 TONS AND OVER; DRAGLINES $41.23 $30.58 $71.81 +105% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 10 MASTER MECHANIC HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S $44.73 $30.58 $75.31 +115% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 COMBINATION BACKHOE/LOADER UP TO 3/4 CU YD; SCRAPERS UP TO 21 CU YD; TIREMAN; FRONT END LOADERS UP TO 4 YDS; WELL D $40.70 $30.58 $71.28 +104% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 ASPHALT ROLLERS; SELF-POWERED ROLLERS AND COMPACTORS; TRACTOR WITHOUT BLADE DRAWING SHEEPSFOOT ROLLER; RUBBER TIRE $37.47 $30.58 $68.05 +94% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 HOISTS; CONVEYORS; POWER PAVEMENT BREAKERS; SELF-POWERED CONCRETE PAVEMENT FINISHING MACHINES; TWO BAG MIXERS WITH $36.35 $30.58 $66.93 +91% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 COMPRESSOR 315 CU FT TO 900 CU FT; PUMPS 4 INCHES TO 16 INCHES. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQ $34.41 $30.58 $64.99 +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 8 TRUCK CRANE CREWS HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR' $42.41 $30.58 $72.99 +109% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 9 OILER HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHI $42.72 $30.58 $73.30 +109% vs market $0.00 $0.00 $0.00 $0.00
PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR D $50.73 $30.58 $81.31 Above median $0.00 $0.00 $0.00 $0.00
PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR D $49.23 $30.58 $79.81 $0.00 $0.00 $0.00 $0.00
PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR D $48.23 $30.58 $78.81 $0.00 $0.00 $0.00 $0.00
PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR D $47.23 $30.58 $77.81 $0.00 $0.00 $0.00 $0.00
PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR D $45.73 $30.58 $76.31 $0.00 $0.00 $0.00 $0.00
ROOFERS $42.48 $30.14 $72.62 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $43.48 $36.46 $79.94 Above median +110% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HA $40.78 $37.35 $78.13 Top 10% +168% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HAZARDOUS $40.95 $37.35 $78.30 Top 10% +169% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTO $41.24 $37.35 $78.59 Top 10% +170% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HA $41.53 $37.35 $78.88 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATE $41.82 $37.35 $79.17 Top 10% +172% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Franklin, MA — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Franklin

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MA20260011-15435-res →