Highway Construction — Washington, Maryland

WD MD20260078-15411-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Washington, Maryland (construction type: highway) is $30.25/hr base + $22.00/hr fringe = $52.25/hr total package (WD MD20260078-15411-hwy, Rev. 1).

Scroll down for all 26 trade classifications covered by this determination.

WD Number: MD20260078-15411-hwy
Revision: 1
Construction Type: highway
State: Maryland (MD)
County: Washington
Effective: May 17, 2026
Trades covered: 26
Official source: SAM.gov reference MD20260078View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $30.25 $22.00 $52.25 +81% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER-SHORING SCAFFOLD BUILDER $30.25 $22.00 $52.25 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $30.13 $21.35 $51.48 +117% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.00 $20.68 $61.68 Above median +95% vs market $0.00 $0.00 $0.00 $0.00
INSULATION WORKER $40.02 $19.92 $59.94 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $31.00 $24.40 $55.40 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $31.00 $24.40 $55.40 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $31.00 $24.40 $55.40 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER-FENCE ERECTOR $31.00 $24.40 $55.40 Bottom 10% +70% vs market $0.00 $0.00 $0.00 $0.00
LABORER $23.81 $22.70 $46.51 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $23.81 $22.70 $46.51 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $23.81 $22.70 $46.51 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $35.82 $20.01 $55.83 +62% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $44.18 $16.08 $60.26 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $35.47 $16.70 $52.17 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (SKID STEER) $35.47 $16.70 $52.17 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR.$ 35.47 16.70 POWER EQUIPMENT OPERATOR $35.47 $16.70 $52.17 +79% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE $35.47 $16.70 $52.17 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $35.47 $16.70 $52.17 Above median +79% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR $35.47 $16.70 $52.17 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $35.47 $16.70 $52.17 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE $26.37 $4.42 $30.79 Above median +6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCREED $35.47 $16.70 $52.17 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $35.47 $16.70 $52.17 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $27.00 $4.86 $31.86 Above median +16% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $27.29 $9.02 $36.31 Above median +32% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Washington, MD — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Washington

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MD20260078-15411-hwy →