Residential Construction — St Mary's, Maryland

WD MD20260068-16461-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in St Mary's, Maryland (construction type: residential) is $19.77/hr base + $0.00/hr fringe = $19.77/hr total package (WD MD20260068-16461-res, Rev. 1).

Scroll down for all 17 trade classifications covered by this determination.

WD Number: MD20260068-16461-res
Revision: 1
Construction Type: residential
State: Maryland (MD)
County: St Mary's
Effective: May 17, 2026
Trades covered: 17
Official source: SAM.gov reference MD20260068View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $19.77 $0.00 $19.77 -30% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION $19.20 $3.48 $22.68 Top 10% -22% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.40 $2.00 $18.40 -22% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $19.28 $0.00 $19.28 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $27.01 $8.16 $35.17 +11% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $17.31 $0.00 $17.31 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON TENDING AND CEMENT MASON TENDING $12.25 $2.75 $15.00 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.19 $2.15 $18.34 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.46 $2.81 $24.27 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $20.25 $2.06 $22.31 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $16.71 $0.00 $16.71 -29% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $18.80 $6.63 $25.43 -16% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $26.00 $6.67 $32.67 Bottom 10% +7% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $19.40 $4.28 $23.68 -5% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $19.89 $1.20 $21.09 -29% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $20.75 $2.85 $23.60 -22% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $14.50 $0.00 $14.50 -37% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the St Mary's, MD — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in St Mary's

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MD20260068-16461-res →