Highway Construction — Somerset, Maryland

WD MD20260075-16442-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Somerset, Maryland (construction type: highway) is $27.00/hr base + $6.97/hr fringe = $33.97/hr total package (WD MD20260075-16442-hwy, Rev. 1).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: MD20260075-16442-hwy
Revision: 1
Construction Type: highway
State: Maryland (MD)
County: Somerset
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference MD20260075View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $27.00 $6.97 $33.97 +18% vs market $0.00 $0.00 $0.00 $0.00
LABORER $22.51 $2.85 $25.36 +14% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $22.51 $2.85 $25.36 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $37.50 $14.85 $52.35 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $21.00 $0.98 $21.98 -25% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $24.83 $4.74 $29.57 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $22.67 $4.14 $26.81 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $23.00 $1.35 $24.35 Above median -16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $29.90 $2.34 $32.24 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $20.00 $0.76 $20.76 -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $26.00 $7.54 $33.54 Above median +15% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (SKID STEER) $22.75 $5.12 $27.87 -4% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE $24.00 $1.85 $25.85 -11% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $41.00 $18.10 $59.10 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR $25.00 $1.74 $26.74 Bottom 10% -8% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE $30.00 $7.59 $37.59 Above median +29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCREED $30.75 $8.12 $38.87 Top 10% +33% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $29.39 $10.51 $39.90 Above median +45% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $28.69 $10.51 $39.20 Above median +43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $29.68 $10.51 $40.19 Above median +46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $23.77 $4.99 $28.76 Above median +5% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $20.00 $0.76 $20.76 Above median -24% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Somerset, MD — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Somerset

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MD20260075-16442-hwy →