Highway Construction — Howard, Maryland

WD MD20260041-15408-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Howard, Maryland (construction type: highway) is $37.50/hr base + $14.78/hr fringe = $52.28/hr total package (WD MD20260041-15408-hwy, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: MD20260041-15408-hwy
Revision: 1
Construction Type: highway
State: Maryland (MD)
County: Howard
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference MD20260041View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $37.50 $14.78 $52.28 +86% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $34.41 $14.49 $48.90 +69% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER-SHORING SCAFFOLD BUILDER $34.41 $14.49 $48.90 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $25.85 $10.95 $36.80 Bottom 10% +55% vs market $0.00 $0.00 $0.00 $0.00
COMMUNICATION INSTALLER TECHNICIAN $25.00 $5.31 $30.31 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.00 $19.87 $65.87 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $30.70 $23.91 $54.61 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $37.25 $23.24 $60.49 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
LABORER $20.11 $3.90 $24.01 +8% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.33 $7.64 $35.97 +62% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $20.11 $3.90 $24.01 Above median +8% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $28.33 $7.64 $35.97 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $38.61 $17.21 $55.82 +62% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $44.18 $16.08 $60.26 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVER $36.60 $17.53 $54.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $37.50 $14.85 $52.35 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $30.04 $13.55 $43.59 Above median +50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $32.10 $13.55 $45.65 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $33.00 $13.55 $46.55 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $34.00 $13.55 $47.55 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $34.50 $13.55 $48.05 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (SKID STEER) $30.04 $13.55 $43.59 Above median +50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE $33.00 $13.55 $46.55 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $41.00 $18.10 $59.10 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR $33.00 $13.55 $46.55 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $34.00 $13.55 $47.55 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE $33.00 $13.55 $46.55 Top 10% +60% vs market $0.00 $0.00 $0.00 $0.00
STONE MASON $44.30 $21.22 $65.52 Top 10% $0.00 $0.00 $0.00 $0.00
TILE & TERRAZZO FINISHER $28.09 $12.59 $40.68 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $29.39 $10.51 $39.90 Above median +45% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $30.40 $10.51 $40.91 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $29.68 $10.51 $40.19 Above median +46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $23.66 $12.07 $35.73 Above median +30% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Howard, MD — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Howard

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MD20260041-15408-hwy →