Highway Construction — Frederick, Maryland

WD MD20260038-16458-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Frederick, Maryland (construction type: highway) is $37.50/hr base + $14.78/hr fringe = $52.28/hr total package (WD MD20260038-16458-hwy, Rev. 1).

Scroll down for all 31 trade classifications covered by this determination.

WD Number: MD20260038-16458-hwy
Revision: 1
Construction Type: highway
State: Maryland (MD)
County: Frederick
Effective: May 17, 2026
Trades covered: 31
Official source: SAM.gov reference MD20260038View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $37.50 $14.78 $52.28 +86% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $34.41 $14.49 $48.90 +69% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER-SHORING SCAFFOLD BUILDER $34.41 $14.49 $48.90 Above median +69% vs market $0.00 $0.00 $0.00 $0.00
LABORER $15.70 $0.33 $16.03 -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER $30.61 $8.82 $39.43 +77% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $15.70 $0.33 $16.03 -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $30.61 $8.82 $39.43 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $44.18 $16.08 $60.26 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $30.04 $13.55 $43.59 Above median +50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $25.37 $7.00 $32.37 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $26.33 $7.00 $33.33 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $33.00 $13.55 $46.55 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $24.85 $8.69 $33.54 Above median +15% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $24.88 $7.00 $31.88 Above median +9% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (SKID STEER) $30.04 $13.55 $43.59 Above median +50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE $33.00 $13.55 $46.55 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $41.00 $18.10 $59.10 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR $33.00 $13.55 $46.55 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $26.85 $7.00 $33.85 Above median +16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE $22.79 $7.00 $29.79 Above median +2% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCREED $25.70 $7.00 $32.70 Above median +12% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $40.46 $26.05 $66.51 +119% vs market $0.00 $0.00 $0.00 $0.00
STONE MASON $44.30 $21.22 $65.52 Top 10% $0.00 $0.00 $0.00 $0.00
TILE & TERRAZZO FINISHER $28.09 $12.59 $40.68 Bottom 10% $0.00 $0.00 $0.00 $0.00
TILE & TERRAZZO MECHANIC $33.41 $14.24 $47.65 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $20.62 $7.00 $27.62 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $25.38 $7.00 $32.38 Above median +18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $24.30 $7.00 $31.30 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $20.00 $7.00 $27.00 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $22.15 $7.00 $29.15 Above median +6% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $23.86 $7.00 $30.86 Above median +12% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Frederick, MD — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Frederick

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MD20260038-16458-hwy →