Building Construction — Dorchester, Maryland

WD MD20260114-16451-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BALANCING TECHNICIAN in Dorchester, Maryland (construction type: building) is $26.25/hr base + $8.29/hr fringe = $34.54/hr total package (WD MD20260114-16451-bld, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: MD20260114-16451-bld
Revision: 1
Construction Type: building
State: Maryland (MD)
County: Dorchester
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference MD20260114View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BALANCING TECHNICIAN $26.25 $8.29 $34.54 Bottom 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $37.50 $14.78 $52.28 +86% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $30.54 $18.76 $49.30 +71% vs market $0.00 $0.00 $0.00 $0.00
CARPET LAYER $34.12 $14.86 $48.98 +108% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $30.50 $0.00 $30.50 Bottom 10% +28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.76 $20.01 $68.77 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC $56.36 $45.50 $101.86 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
INSULATION WORKER $40.02 $19.92 $59.94 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $21.00 $5.49 $26.49 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
LABORER $19.00 $0.11 $19.11 -14% vs market $0.00 $0.00 $0.00 $0.00
LABORER $25.33 $4.36 $29.69 +33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $19.00 $0.11 $19.11 -14% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $25.33 $4.36 $29.69 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
MECHANICAL SYSTEMS SERVICE TECH $46.21 $24.90 $71.11 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLUMBER $52.50 $23.19 $75.69 Above median +149% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $28.60 $14.62 $43.22 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $25.00 $2.89 $27.89 Above median -4% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $21.00 $1.58 $22.58 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $27.75 $8.36 $36.11 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $23.00 $6.81 $29.81 Above median +2% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $34.18 $14.62 $48.80 Above median +67% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $27.95 $0.93 $28.88 Above median -1% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (SKID STEER) $32.23 $14.62 $46.85 Above median +61% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $41.00 $18.10 $59.10 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR $34.18 $14.62 $48.80 Above median +67% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $30.00 $2.46 $32.46 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
RESILIENT FLOOR $34.12 $14.86 $48.98 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER/WATERPROOFER $52.21 $14.91 $67.12 Top 10% +168% vs market $0.00 $0.00 $0.00 $0.00
SHEETMETAL WORKER $47.92 $24.44 $72.36 Above median $0.00 $0.00 $0.00 $0.00
STEAMFITTER/PIPEFITTER $46.21 $24.90 $71.11 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $29.39 $10.51 $39.90 Above median +45% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $28.69 $10.51 $39.20 Above median +43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $29.68 $10.51 $40.19 Above median +46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $23.25 $3.52 $26.77 Above median -3% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Dorchester, MD — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.