Highway Construction — Cecil, Maryland

WD MD20260035-16450-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Cecil, Maryland (construction type: highway) is $37.08/hr base + $25.48/hr fringe = $62.56/hr total package (WD MD20260035-16450-hwy, Rev. 1).

Scroll down for all 31 trade classifications covered by this determination.

WD Number: MD20260035-16450-hwy
Revision: 1
Construction Type: highway
State: Maryland (MD)
County: Cecil
Effective: May 17, 2026
Trades covered: 31
Official source: SAM.gov reference MD20260035View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $37.08 $25.48 $62.56 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER-SHORING SCAFFOLD BUILDER $37.08 $25.48 $62.56 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $31.81 $16.07 $47.88 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
LABORER $19.15 $2.51 $21.66 -3% vs market $0.00 $0.00 $0.00 $0.00
LABORER $26.80 $7.08 $33.88 +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $19.15 $2.51 $21.66 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $26.80 $7.08 $33.88 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $38.61 $17.21 $55.82 +62% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $44.18 $16.08 $60.26 Top 10% +155% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVER $40.55 $15.83 $56.38 Bottom 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $37.50 $14.85 $52.35 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $23.00 $6.79 $29.79 Above median +2% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $25.75 $5.11 $30.86 Above median +6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $22.69 $3.65 $26.34 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $22.00 $2.43 $24.43 Above median -16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $23.95 $5.07 $29.02 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $24.75 $1.23 $25.98 Above median -11% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $24.38 $3.82 $28.20 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $25.75 $7.38 $33.13 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $26.00 $7.75 $33.75 Above median +16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR (SKID STEER) $20.50 $5.10 $25.60 -12% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE $25.70 $1.58 $27.28 -6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $41.00 $18.10 $59.10 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR $26.86 $5.46 $32.32 +11% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE $30.00 $7.53 $37.53 Above median +29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCREED $29.50 $7.59 $37.09 Top 10% +27% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $29.39 $10.51 $39.90 Above median +45% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $28.69 $10.51 $39.20 Above median +43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $29.68 $10.51 $40.19 Above median +46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $22.98 $4.03 $27.01 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $23.00 $1.08 $24.08 Above median -12% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Cecil, MD — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Cecil

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MD20260035-16450-hwy →