Residential Construction — Carroll, Maryland

WD MD20260070-15406-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Carroll, Maryland (construction type: residential) is $26.20/hr base + $7.43/hr fringe = $33.63/hr total package (WD MD20260070-15406-res, Rev. 1).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: MD20260070-15406-res
Revision: 1
Construction Type: residential
State: Maryland (MD)
County: Carroll
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference MD20260070View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $26.20 $7.43 $33.63 +20% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION $19.41 $3.11 $22.52 Top 10% -22% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.92 $0.00 $18.92 -20% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $19.09 $5.00 $24.09 Above median $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $17.27 $0.62 $17.89 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $23.49 $0.81 $24.30 -23% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $34.12 $14.64 $48.76 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $17.31 $0.00 $17.31 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON TENDING AND CEMENT MASON TENDING $13.50 $1.50 $15.00 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.19 $2.15 $18.34 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.40 $4.42 $22.82 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $20.25 $2.06 $22.31 Above median $0.00 $0.00 $0.00 $0.00
PAINTER, EXCLUDES DRYWALL FINISHING/TAPING $15.12 $0.88 $16.00 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $17.60 $0.00 $17.60 -42% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION $20.48 $0.00 $20.48 -33% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $26.80 $0.00 $26.80 +7% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $18.82 $1.20 $20.02 -32% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $26.06 $6.52 $32.58 +7% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Carroll, MD — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Carroll

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MD20260070-15406-res →