Highway Construction — Calvert, Maryland

WD MD20260032-16456-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for INSULATION WORKER in Calvert, Maryland (construction type: highway) is $40.02/hr base + $19.92/hr fringe = $59.94/hr total package (WD MD20260032-16456-hwy, Rev. 1).

Scroll down for all 13 trade classifications covered by this determination.

WD Number: MD20260032-16456-hwy
Revision: 1
Construction Type: highway
State: Maryland (MD)
County: Calvert
Effective: May 17, 2026
Trades covered: 13
Official source: SAM.gov reference MD20260032View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
INSULATION WORKER $40.02 $19.92 $59.94 Top 10% $0.00 $0.00 $0.00 $0.00
LABORER $21.88 $0.92 $22.80 +2% vs market $0.00 $0.00 $0.00 $0.00
LABORER $25.19 $8.49 $33.68 +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $21.88 $0.92 $22.80 Above median +2% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $25.19 $8.49 $33.68 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $38.49 $15.86 $54.35 Bottom 10% +58% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $36.72 $10.97 $47.69 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE $35.00 $10.71 $45.71 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $41.00 $18.10 $59.10 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR $32.35 $10.71 $43.06 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $31.50 $6.30 $37.80 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $30.50 $6.80 $37.30 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $31.00 $6.80 $37.80 Above median +38% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Calvert, MD — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Calvert

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MD20260032-16456-hwy →