Highway Construction — York, Maine

WD ME20260049-17667-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in York, Maine (construction type: highway) is $18.66/hr base + $3.46/hr fringe = $22.12/hr total package (WD ME20260049-17667-hwy, Rev. 1).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: ME20260049-17667-hwy
Revision: 1
Construction Type: highway
State: Maine (ME)
County: York
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference ME20260049View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $18.66 $3.46 $22.12 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.83 $1.16 $20.99 -19% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.21 $5.63 $30.84 -5% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: LABORER $16.27 $2.19 $18.46 Top 10% $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $19.98 $2.55 $22.53 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $21.85 $0.00 $21.85 -28% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $22.78 $4.40 $27.18 -10% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $17.53 $2.13 $19.66 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.11 $2.46 $17.57 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: EPOXY INJECTOR $13.43 $1.15 $14.58 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: WHEELMAN $20.97 $5.13 $26.10 Top 10% +19% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.58 $3.81 $24.39 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $23.66 $0.97 $24.63 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $19.49 $0.00 $19.49 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.71 $5.67 $27.38 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $27.40 $8.13 $35.53 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $18.91 $3.27 $22.18 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $24.71 $7.83 $32.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $27.44 $6.37 $33.81 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $20.17 $4.83 $25.00 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $16.52 $1.66 $18.18 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER ASPHALT $19.64 $6.09 $25.73 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $10.33 $0.00 $10.33 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $17.84 $5.91 $23.75 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.99 $4.00 $23.99 Above median -4% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the York, ME — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in York

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ME20260049-17667-hwy →