Highway Construction — Washington, Maine

WD ME20260044-17798-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Washington, Maine (construction type: highway) is $18.34/hr base + $2.84/hr fringe = $21.18/hr total package (WD ME20260044-17798-hwy, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: ME20260044-17798-hwy
Revision: 1
Construction Type: highway
State: Maine (ME)
County: Washington
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference ME20260044View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $18.34 $2.84 $21.18 Above median -26% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: LABORER $14.24 $2.06 $16.30 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $16.27 $0.00 $16.27 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $14.32 $3.17 $17.49 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.24 $1.93 $15.17 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: WHEELMAN $15.40 $3.01 $18.41 Bottom 10% -16% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.58 $2.92 $20.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.36 $5.06 $25.42 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $16.52 $6.38 $22.90 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.58 $2.89 $19.47 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.18 $4.72 $21.90 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $22.30 $8.71 $31.01 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $15.81 $1.72 $17.53 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $18.82 $4.75 $23.57 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE, MILLING MACHINE, PAVER, ROLLER ASPHALT $30.17 $13.80 $43.97 +66% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $9.00 $0.00 $9.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $17.48 $5.37 $22.85 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.35 $6.33 $20.68 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TACKTRUCK $18.82 $8.29 $27.11 Bottom 10% +9% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Washington, ME — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.