Building Construction — Somerset, Maine

WD ME20260012-17975-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Somerset, Maine (construction type: building) is $43.91/hr base + $28.47/hr fringe = $72.38/hr total package (WD ME20260012-17975-bld, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: ME20260012-17975-bld
Revision: 1
Construction Type: building
State: Maine (ME)
County: Somerset
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference ME20260012View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $43.91 $28.47 $72.38 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION $19.56 $7.13 $26.69 Above median -6% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.13 $3.82 $19.95 -23% vs market $0.00 $0.00 $0.00 $0.00
CREDIT $74.17 $38.44 $112.61 Top 10% $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $16.84 $2.87 $19.71 -21% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.27 $9.30 $34.57 +6% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $22.61 $8.67 $31.28 +4% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND REINFORCING $33.65 $26.27 $59.92 Bottom 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.36 $0.00 $11.36 -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $18.33 $2.01 $20.34 Above median -7% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.42 $3.12 $23.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $23.98 $7.46 $31.44 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $15.86 $2.66 $18.52 -32% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 16.97 1.92 PLUMBER, INCLUDES HVAC PIPE INSTALLATION $20.35 $5.09 $25.44 -12% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.79 $2.53 $17.32 Above median -31% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Somerset, ME — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Somerset

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ME20260012-17975-bld →