Residential Construction — Sagadahoc, Maine

WD ME20260005-17610-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Sagadahoc, Maine (construction type: residential) is $9.26/hr base + $0.00/hr fringe = $9.26/hr total package (WD ME20260005-17610-res, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: ME20260005-17610-res
Revision: 1
Construction Type: residential
State: Maine (ME)
County: Sagadahoc
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference ME20260005View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $9.26 $0.00 $9.26 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $11.05 $0.00 $11.05 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
LABORER $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $7.25 $0.00 $7.25 Bottom 10% -73% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, PIPEFITTERS $9.50 $0.72 $10.22 Above median -66% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $7.25 $0.00 $7.25 Bottom 10% -73% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ASPHALT ROLLER $7.50 $0.00 $7.50 Top 10% -72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $7.25 $0.00 $7.25 Bottom 10% -73% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FRONT END LOADER $7.50 $0.00 $7.50 -72% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $8.17 $0.00 $8.17 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $7.25 $0.00 $7.25 Bottom 10% -71% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sagadahoc, ME — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Sagadahoc

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ME20260005-17610-res →