Highway Construction — Penobscot, Maine

WD ME20260047-17906-hwy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Penobscot, Maine (construction type: highway) is $18.95/hr base + $3.23/hr fringe = $22.18/hr total package (WD ME20260047-17906-hwy, Rev. 2).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: ME20260047-17906-hwy
Revision: 2
Construction Type: highway
State: Maine (ME)
County: Penobscot
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference ME20260047View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $18.95 $3.23 $22.18 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.27 $1.13 $20.40 -21% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.78 $6.83 $32.61 +0% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $21.85 $0.00 $21.85 -28% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $22.33 $4.50 $26.83 -11% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $17.08 $2.48 $19.56 Above median -11% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.83 $2.20 $15.03 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $17.03 $2.81 $19.84 Above median -9% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.33 $2.78 $19.11 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $19.26 $5.57 $24.83 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $18.77 $0.00 $18.77 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.71 $5.67 $27.38 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $18.94 $7.66 $26.60 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $26.83 $7.05 $33.88 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $17.61 $2.97 $20.58 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE, MECHANIC, PAVER, ROLLER ASPHALT $30.17 $13.80 $43.97 +66% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $9.00 $0.00 $9.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $17.02 $5.37 $22.39 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.56 $6.32 $20.88 Above median -16% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: VACUUM TRUCK $25.65 $17.69 $43.34 +74% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Penobscot, ME — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Penobscot

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ME20260047-17906-hwy →