Highway Construction — Oxford, Maine

WD ME20260040-17849-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Oxford, Maine (construction type: highway) is $18.34/hr base + $2.84/hr fringe = $21.18/hr total package (WD ME20260040-17849-hwy, Rev. 1).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: ME20260040-17849-hwy
Revision: 1
Construction Type: highway
State: Maine (ME)
County: Oxford
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference ME20260040View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $18.34 $2.84 $21.18 Above median -26% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: LABORER $14.80 $1.27 $16.07 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $16.27 $0.00 $16.27 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $15.40 $2.69 $18.09 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.83 $1.99 $17.82 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $18.69 $2.70 $21.39 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
LABORER: WHEELMAN $15.64 $4.29 $19.93 Above median -9% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.80 $4.16 $22.96 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.38 $1.66 $22.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $19.09 $5.20 $24.29 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $17.30 $3.50 $20.80 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $18.59 $5.53 $24.12 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $22.07 $8.73 $30.80 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $21.46 $8.78 $30.24 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $16.43 $3.40 $19.83 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER ASPHALT $24.16 $3.55 $27.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $19.02 $4.82 $23.84 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE, MILLING MACHINE $30.17 $13.80 $43.97 +66% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $9.38 $0.00 $9.38 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $17.47 $4.80 $22.27 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.83 $1.16 $16.99 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TACKTRUCK $20.18 $7.75 $27.93 Top 10% +12% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Oxford, ME — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.