Building Construction — Aroostook, Maine

WD ME20260006-17905-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Aroostook, Maine (construction type: building) is $27.38/hr base + $9.14/hr fringe = $36.52/hr total package (WD ME20260006-17905-bld, Rev. 1).

Scroll down for all 13 trade classifications covered by this determination.

WD Number: ME20260006-17905-bld
Revision: 1
Construction Type: building
State: Maine (ME)
County: Aroostook
Effective: May 17, 2026
Trades covered: 13
Official source: SAM.gov reference ME20260006View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $27.38 $9.14 $36.52 +13% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $17.54 $4.13 $21.67 Above median -24% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.13 $3.82 $19.95 -23% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $22.78 $7.35 $30.13 -8% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $20.65 $8.26 $28.91 -4% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND REINFORCING $33.65 $26.27 $59.92 Bottom 10% +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.59 $2.72 $16.31 Above median -26% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $18.33 $2.01 $20.34 Above median -7% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.42 $3.12 $23.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.07 $6.08 $30.15 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER $40.00 $24.71 $64.71 +117% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 16.97 1.92 PAINTER $17.38 $4.70 $22.08 -24% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.79 $2.53 $17.32 Above median -31% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Aroostook, ME — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Aroostook

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for ME20260006-17905-bld →