Highway Construction — West Baton Rouge, Louisiana

WD LA20260013-15352-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in West Baton Rouge, Louisiana (construction type: highway) is $18.22/hr base + $4.48/hr fringe = $22.70/hr total package (WD LA20260013-15352-hwy, Rev. 1).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: LA20260013-15352-hwy
Revision: 1
Construction Type: highway
State: Louisiana (LA)
County: West Baton Rouge
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference LA20260013View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $18.22 $4.48 $22.70 Above median -5% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.03 $4.24 $24.27 -2% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.49 $0.00 $17.49 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.79 $1.73 $14.52 Above median -25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.00 $3.50 $14.50 Above median -25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.00 $2.77 $17.77 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
MECHANIC $25.40 $8.05 $33.45 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ASPHALT PAVER $17.20 $4.97 $22.17 Top 10% -7% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR/TRACKHOE $16.13 $0.00 $16.13 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BROOM/SWEEPER $14.05 $0.00 $14.05 Bottom 10% -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $16.40 $0.00 $16.40 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE $24.30 $0.00 $24.30 Top 10% +2% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GRADER/BLADE $15.88 $0.00 $15.88 Bottom 10% -33% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MILLING MACHINE $15.38 $2.14 $17.52 Above median -27% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ROLLER $14.29 $4.23 $18.52 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: TRENCHER $14.38 $0.00 $14.38 Top 10% -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: DUMP TRUCK $12.69 $0.00 $12.69 -46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: WATER TRUCK $13.79 $0.00 $13.79 Top 10% -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the West Baton Rouge, LA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in West Baton Rouge

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for LA20260013-15352-hwy →