Highway Construction — Tensas, Louisiana
WD LA20260015-15336-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Tensas, Louisiana (construction type: highway) is $13.45/hr base + $1.85/hr fringe = $15.30/hr total package (WD LA20260015-15336-hwy, Rev. 1).
Scroll down for all 24 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $13.45 | $1.85 | $15.30 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $13.47 | $0.00 | $13.47 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $16.49 | $0.00 | $16.49 -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.59 | $0.00 | $11.59 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.46 | $0.00 | $11.46 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $12.69 | $0.00 | $12.69 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: TRAFFIC CONTROL/FLAGGER | $9.06 | $0.00 | $9.06 Top 10% -53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: ASPHALT PAVER | $17.50 | $0.00 | $17.50 Bottom 10% -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: ASPHALT SPREADER | $16.50 | $0.00 | $16.50 Top 10% -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR/TRACKHOE | $15.59 | $0.00 | $15.59 Bottom 10% -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BROOM | $12.46 | $0.00 | $12.46 Top 10% -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | $15.07 | $0.00 | $15.07 Above median -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: CRANE | $17.00 | $0.00 | $17.00 Above median -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GRADER/BLADE | $17.19 | $0.00 | $17.19 Top 10% -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: LOADER | $13.68 | $0.00 | $13.68 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: MECHANIC | $15.86 | $0.00 | $15.86 Above median -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: MILLING MACHINE | $13.31 | $0.00 | $13.31 Bottom 10% -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: ROLLER | $13.82 | $0.00 | $13.82 Above median -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: SCREED | $15.13 | $0.00 | $15.13 Top 10% -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: SHUTTLE BUGGY | $14.76 | $0.00 | $14.76 Top 10% -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: TRACTOR | $10.36 | $0.00 | $10.36 -57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: DUMP TRUCK | $14.15 | $0.00 | $14.15 Top 10% -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: LOWBOY TRUCK | $14.04 | $0.00 | $14.04 Top 10% -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: WATER TRUCK | $12.53 | $0.00 | $12.53 Bottom 10% -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Tensas, LA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Tensas
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Tensas, Louisiana.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.