Building Construction — St Landry, Louisiana

WD LA20260021-15348-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in St Landry, Louisiana (construction type: building) is $32.66/hr base + $9.86/hr fringe = $42.52/hr total package (WD LA20260021-15348-bld, Rev. 1).

Scroll down for all 13 trade classifications covered by this determination.

WD Number: LA20260021-15348-bld
Revision: 1
Construction Type: building
State: Louisiana (LA)
County: St Landry
Effective: May 17, 2026
Trades covered: 13
Official source: SAM.gov reference LA20260021View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $32.66 $9.86 $42.52 +77% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.00 $0.00 $20.00 -12% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $16.86 $0.00 $16.86 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.98 $15.14 $47.12 +64% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING $22.54 $8.39 $30.93 +8% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $14.25 $0.00 $14.25 Above median $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.42 $0.69 $14.11 Above median -27% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.50 $3.40 $21.90 Above median $0.00 $0.00 $0.00 $0.00
PLUMBER $26.50 $13.39 $39.89 +28% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $23.04 $9.34 $32.38 +47% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $25.16 $10.11 $35.27 +34% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $27.00 $6.91 $33.91 +9% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.50 $2.68 $17.18 Above median -27% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the St Landry, LA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in St Landry

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for LA20260021-15348-bld →