Building Construction — St Helena, Louisiana

WD LA20260049-15347-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in St Helena, Louisiana (construction type: building) is $32.66/hr base + $9.86/hr fringe = $42.52/hr total package (WD LA20260049-15347-bld, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: LA20260049-15347-bld
Revision: 1
Construction Type: building
State: Louisiana (LA)
County: St Helena
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference LA20260049View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $32.66 $9.86 $42.52 +77% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.00 $0.00 $20.00 -12% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $18.26 $0.00 $18.26 -24% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.24 $2.56 $18.80 -24% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $29.47 $13.50 $42.97 +50% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $34.75 $13.86 $48.61 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $34.75 $13.86 $48.61 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.10 $0.00 $13.10 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.17 $0.00 $12.17 -37% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.07 $0.00 $19.07 $0.00 $0.00 $0.00 $0.00
PAINTER $18.83 $9.48 $28.31 +35% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $18.30 $8.91 $27.21 +30% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $34.87 $17.79 $52.66 +69% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $32.42 $16.50 $48.92 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE CRANE PREMIUMS: 50-150 TONS $1.75 OVER 150 TONS $2.25 $23.46 $8.35 $31.81 Top 10% +33% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $23.04 $9.34 $32.38 +47% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $30.38 $14.20 $44.58 +69% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $20.07 $1.27 $21.34 Bottom 10% -31% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $20.00 $0.00 $20.00 -9% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.26 $0.00 $17.26 Above median -26% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the St Helena, LA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in St Helena

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for LA20260049-15347-bld →