Building Construction — Orleans, Louisiana

WD LA20260041-15356-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Orleans, Louisiana (construction type: building) is $32.66/hr base + $9.86/hr fringe = $42.52/hr total package (WD LA20260041-15356-bld, Rev. 2).

Scroll down for all 24 trade classifications covered by this determination.

WD Number: LA20260041-15356-bld
Revision: 2
Construction Type: building
State: Louisiana (LA)
County: Orleans
Effective: May 17, 2026
Trades covered: 24
Official source: SAM.gov reference LA20260041View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $32.66 $9.86 $42.52 +77% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $18.66 $0.00 $18.66 -18% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $15.00 $0.00 $15.00 -37% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION, AND FORM WORK $19.37 $2.46 $21.83 -9% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $30.47 $7.97 $38.44 Above median +56% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $16.55 $0.00 $16.55 $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $18.21 $4.90 $23.11 Above median +31% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.00 $16.66 $52.66 +84% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANK $51.11 $38.44 $89.55 Above median $0.00 $0.00 $0.00 $0.00
GLAZIER $25.44 $12.20 $37.64 +76% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $34.75 $13.86 $48.61 +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.09 $0.00 $13.09 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.38 $0.00 $12.38 -36% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.92 $0.00 $22.92 Above median $0.00 $0.00 $0.00 $0.00
PAINTER, EXCLUDES DRYWALL FINISHING/TAPING $17.25 $0.00 $17.25 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY ONLY $18.83 $9.48 $28.31 Above median +35% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $34.87 $17.79 $52.66 +69% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $33.30 $14.98 $48.28 Above median +55% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE CRANE PREMIUMS: 50-150 TONS $1.75 OVER 150 TONS $2.25 $23.46 $8.35 $31.81 Top 10% +33% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $16.77 $5.66 $22.43 +2% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $26.71 $11.93 $38.64 +46% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $21.08 $5.79 $26.87 -14% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $20.00 $0.00 $20.00 -9% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.00 $0.00 $15.00 -36% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Orleans, LA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Orleans

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for LA20260041-15356-bld →