Highway Construction — Iberia, Louisiana
WD LA20260014-15342-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Iberia, Louisiana (construction type: highway) is $11.55/hr base + $1.85/hr fringe = $13.40/hr total package (WD LA20260014-15342-hwy, Rev. 1).
Scroll down for all 40 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $11.55 | $1.85 | $13.40 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES FORM WORK | $13.56 | $1.85 | $15.41 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $13.52 | $0.00 | $13.52 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $13.58 | $0.00 | $13.58 Bottom 10% -58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $10.44 | $0.00 | $10.44 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $10.86 | $0.00 | $10.86 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $10.60 | $0.00 | $10.60 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $9.68 | $0.00 | $9.68 -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $12.69 | $0.00 | $12.69 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: TRAFFIC CONTROL/FLAGGER | $9.00 | $0.00 | $9.00 Bottom 10% -53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN | $13.07 | $0.00 | $13.07 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVER | $14.52 | $0.00 | $14.52 Bottom 10% -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT SPREADER | $16.50 | $0.00 | $16.50 Bottom 10% -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.24 | $0.00 | $14.24 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $13.09 | $0.00 | $13.09 Bottom 10% -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.15 | $0.00 | $14.15 Bottom 10% -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BROOM | $13.00 | $0.00 | $13.00 Top 10% -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $14.63 | $0.00 | $14.63 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $14.74 | $0.00 | $14.74 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $17.72 | $0.00 | $17.72 Bottom 10% -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $15.66 | $0.00 | $15.66 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $17.19 | $0.00 | $17.19 -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $19.67 | $0.00 | $19.67 -18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER | $13.68 | $0.00 | $13.68 Bottom 10% -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $15.15 | $0.00 | $15.15 Bottom 10% -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: MILLING MACHINE | $13.31 | $0.00 | $13.31 Bottom 10% -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $11.49 | $0.00 | $11.49 Bottom 10% -52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $11.94 | $0.00 | $11.94 Bottom 10% -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | $13.42 | $0.00 | $13.42 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SCREED | $15.13 | $0.00 | $15.13 -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SHUTTLE BUGGY | $14.21 | $0.00 | $14.21 Top 10% -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SOIL STABILIZER..$ 13.08 0.00 POWER EQUIPMENT OPERATOR: SOIL STABILIZER | $12.34 | $0.00 | $12.34 Top 10% -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $10.36 | $0.00 | $10.36 Bottom 10% -57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $12.00 | $0.00 | $12.00 -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $12.22 | $0.00 | $12.22 -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $13.93 | $0.00 | $13.93 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TACK TRUCK | $16.13 | $0.00 | $16.13 Top 10% -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $12.69 | $0.00 | $12.69 Bottom 10% -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $12.41 | $0.00 | $12.41 Bottom 10% -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $11.95 | $0.00 | $11.95 Bottom 10% -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Iberia, LA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Iberia
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Iberia, Louisiana.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.