Highway Construction — De Soto, Louisiana

WD LA20260010-15376-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in De Soto, Louisiana (construction type: highway) is $14.80/hr base + $0.00/hr fringe = $14.80/hr total package (WD LA20260010-15376-hwy, Rev. 1).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: LA20260010-15376-hwy
Revision: 1
Construction Type: highway
State: Louisiana (LA)
County: De Soto
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference LA20260010View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $14.80 $0.00 $14.80 -38% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.00 $0.00 $16.00 -35% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES INSTALLATION OF TRAFFIC SIGNALS $22.90 $8.58 $31.48 Top 10% +10% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $16.88 $0.00 $16.88 -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.21 $0.80 $12.01 -38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ASPHALT PAVER $17.20 $4.97 $22.17 Top 10% -7% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR/TRACKHOE $16.11 $0.00 $16.11 -33% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BROOM/SWEEPER $15.17 $5.15 $20.32 Top 10% -15% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BROOM/SWEEPER $14.05 $5.15 $19.20 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $16.60 $0.00 $16.60 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE $24.30 $0.00 $24.30 Top 10% +2% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GRADER/BLADE $17.00 $0.00 $17.00 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MECHANIC $13.08 $2.20 $15.28 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MILLING MACHINE $15.38 $2.14 $17.52 Above median -27% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ROLLER $13.00 $0.00 $13.00 -46% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: TRENCHER $14.38 $0.00 $14.38 Top 10% -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: DUMP TRUCK $11.86 $0.00 $11.86 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: WATER TRUCK $13.79 $0.00 $13.79 Top 10% -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the De Soto, LA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in De Soto

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for LA20260010-15376-hwy →