Heavy Construction — Calcasieu, Louisiana

WD LA20260008-14809-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Calcasieu, Louisiana (construction type: heavy) is $30.49/hr base + $23.13/hr fringe = $53.62/hr total package (WD LA20260008-14809-hvy, Rev. 2).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: LA20260008-14809-hvy
Revision: 2
Construction Type: heavy
State: Louisiana (LA)
County: Calcasieu
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference LA20260008View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $30.49 $23.13 $53.62 Bottom 10% +46% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING DRYWALL HANGING/FRAMING, METAL STUDS, AND FORMSETTING/FORMBUILDING $32.59 $11.06 $43.65 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING DRYWALL HANGING/FRAMING, METAL STUDS, AND FORMSETTING/FORMBUILDING (ASCENSION, EAST BATON ROUGE, LIVINGSTON AND ST. JAMES PARISHE $32.59 $11.06 $43.65 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING DRYWALL HANGING/FRAMING, METAL STUDS, AND FORMSETTING/FORMBUILDING (JEFFERSON, LAFOURCHE, ORLEANS, PLAQUEMINES, ST. BERNARD, ST $32.59 $10.52 $43.11 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.89 $2.45 $19.34 -22% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING $35.85 $15.58 $51.43 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING $29.55 $14.36 $43.91 Above median +53% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING $30.00 $12.03 $42.03 Bottom 10% +47% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING $29.47 $13.50 $42.97 +50% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING $30.35 $12.46 $42.81 +49% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (ACADIA, CALCASIEU, LAFAYETTE, AND ST. MARTIN PARISHES) $31.98 $15.14 $47.12 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (JEFFERSON, LAFOURCHE, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST. JAMES, ST. JOHN THE BAPTIST, ST $36.00 $16.66 $52.66 Top 10% +84% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $34.75 $13.86 $48.61 Bottom 10% +51% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL (ACADIA, CALCASIEU, LAFAYETTE, OUACHITA, AND RAPIDES PARISHES) $34.75 $13.86 $48.61 Top 10% +51% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND REINFORCING (ASCENSION, EAST BATON ROUGE, LAFAYETTE, LIVINGSTON, ST. JAMES, ST. LANDRY, AND ST. MARTIN PARISH) $34.75 $13.86 $48.61 Top 10% +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON $12.79 $1.73 $14.52 Above median -25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON $11.00 $3.50 $14.50 -25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON $15.00 $2.77 $17.77 Top 10% -8% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON $12.00 $2.10 $14.10 Bottom 10% -27% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON ST. JAMES AND ST. TAMMANY PARISHES..$ 10.00 1.73 LABORER: COMMON $11.19 $1.73 $12.92 Top 10% -33% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $40.34 $14.16 $54.50 Bottom 10% +68% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, SPRAY, AND SANDBLASTER $21.91 $9.73 $31.64 Top 10% +51% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: INCLUDING HVAC PIPE AND SETTING SYSTEM $28.48 $14.47 $42.95 Top 10% +38% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: INCLUDING HVAC PIPE AND SETTING SYSTEM $28.75 $11.86 $40.61 Above median +30% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: INCLUDING HVAC PIPE AND SETTING SYSTEM $26.50 $13.39 $39.89 Bottom 10% +28% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: INCLUDING HVAC PIPE AND SETTING SYSTEM (ACADIA, CALCASIEU, LAFAYETTE, ST. LANDRY, AND ST. MARTIN PARISHES) $25.90 $13.65 $39.55 Top 10% +27% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: INCLUDING HVAC PIPE AND SETTING SYSTEM (ASCENSION, EAST BATON ROUGE, LIVINGSTON, ST. JAMES, AND ST. MARTIN PARISHES) $32.42 $16.50 $48.92 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: INCLUDING HVAC PIPE AND SETTING SYSTEM (JEFFERSON, LAFOURCHE, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST. JAMES, ST. JOHN THE BAPTIST $31.70 $13.85 $45.55 Top 10% +46% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIMENT OPERATORS: CRANE, 50 TO 150 TONS $25.15 $7.95 $33.10 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIMENT OPERATORS: CRANE, BELOW 50 TONS $24.65 $7.95 $32.60 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIMENT OPERATORS: CRANE, OVER 150 TONS $26.15 $7.95 $34.10 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $11.16 $3.09 $14.25 Bottom 10% -40% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE, 50 TO 150 TONS $25.15 $7.95 $33.10 Top 10% +39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE, BELOW 50 TONS $24.65 $7.95 $32.60 Bottom 10% +37% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE, BELOW 50 TONS $24.90 $7.95 $32.85 Top 10% +38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE, OVER 150 TONS $26.15 $7.95 $34.10 Top 10% +43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANE, OVER 150 TONS $25.40 $7.95 $33.35 Bottom 10% +40% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Calcasieu, LA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Calcasieu

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for LA20260008-14809-hvy →