Building Construction — Rowan, Kentucky

WD KY20260035-15293-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Rowan, Kentucky (construction type: building) is $30.00/hr base + $20.89/hr fringe = $50.89/hr total package (WD KY20260035-15293-bld, Rev. 1).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: KY20260035-15293-bld
Revision: 1
Construction Type: building
State: Kentucky (KY)
County: Rowan
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference KY20260035View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $30.00 $20.89 $50.89 +133% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.85 $28.44 $72.29 +105% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $23.53 $11.62 $35.15 +18% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $37.04 $26.57 $63.61 Above median +160% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $19.97 $9.54 $29.51 +21% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $22.53 $10.25 $32.78 Above median +34% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.92 $10.90 $31.82 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $29.53 $12.94 $42.47 +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $35.63 $26.49 $62.12 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $36.17 $25.80 $61.97 Above median +88% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $36.21 $26.42 $62.63 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.13 $17.38 $45.51 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.53 $17.38 $45.91 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.73 $17.38 $46.11 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $20.67 $7.65 $28.32 Above median +30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $22.36 $10.76 $33.12 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $23.17 $10.05 $33.22 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: POWER TOOL OPERATOR $26.73 $16.72 $43.45 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $35.54 $29.13 $64.67 +105% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $24.55 $10.61 $35.16 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $24.64 $13.00 $37.64 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $40.05 $19.10 $59.15 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.33 $13.00 $37.33 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $34.29 $23.95 $58.24 Above median +165% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $22.74 $12.69 $35.43 Above median +61% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $41.00 $21.66 $62.66 +109% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $30.36 $13.62 $43.98 +47% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $34.99 $19.60 $54.59 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS $41.98 $19.60 $61.58 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $41.98 $19.60 $61.58 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $22.31 $7.41 $29.72 +30% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.32 $25.66 $65.98 Above median +179% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $27.74 $13.20 $40.94 +73% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $44.15 $26.08 $70.23 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $17.67 $7.45 $25.12 +13% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $25.77 $6.10 $31.87 +44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.07 $6.25 $23.32 Above median -13% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Rowan, KY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Rowan

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KY20260035-15293-bld →