Highway Construction — Pendleton, Kentucky

WD KY20260039-16315-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Pendleton, Kentucky (construction type: highway) is $35.00/hr base + $17.13/hr fringe = $52.13/hr total package (WD KY20260039-16315-hwy, Rev. 1).

Scroll down for all 31 trade classifications covered by this determination.

WD Number: KY20260039-16315-hwy
Revision: 1
Construction Type: highway
State: Kentucky (KY)
County: Pendleton
Effective: May 17, 2026
Trades covered: 31
Official source: SAM.gov reference KY20260039View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $35.00 $17.13 $52.13 +74% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER & PILEDRIVERMEN $33.28 $20.56 $53.84 Bottom 10% +120% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $29.57 $14.75 $44.32 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
DIVER $49.92 $20.56 $70.48 Above median $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.05 $22.97 $61.02 Above median +113% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $38.27 $23.90 $62.17 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: FENCE ERECTOR $35.88 $23.90 $59.78 Bottom 10% +81% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: STRUCTURAL $37.77 $23.90 $61.67 +87% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 ASPHALT LABORER; CARPENTER TENDER; CONCRETE CURING APPLICATOR; DUMP MAN; GUARDRAIL AND FENCE INSTALLER; JOINT SETTER; LABORER; LANDSCA $37.27 $15.95 $53.22 +144% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 BATTER BOARD MAN; BRICKMASON TENDER; MORTAR MIXER OPERATOR; SCAFFOLD BUILDER; BURNER & WELDER; BUSHAMMER; CHAIN SAW OPERATOR; CONCRETE $27.12 $19.66 $46.78 +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 SKID STEER; ASPHALT RAKER; CONCRETE PUDDLER; KETTLE MAN; MACHINE DRIVEN TOOLS; MASON TENDER; BRICK PAVER; MORTAR MIXER; POWER BUGGY OR $37.44 $15.95 $53.39 +145% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 ASPHALT LUTEMAN & RAKER; GUNNITE NOZZLEMAN; GUNNITE OPERATOR & MIXER; GROUT PUMP OPERATOR; SIDE RAIL SETTER; RAIL PAVED DITCHES; SCREW $27.17 $19.66 $46.83 +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 BLASTER; MUCKER; POWDER PERSON; TOP LANDER; WRENCHER; YARNER; HAZARDOUS WASTE; CONCRETE SPECIALIST; CONCRETE CREW IN TUNNELS; CURB SET $37.77 $15.95 $53.72 +146% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 4 CAISSON WORKER; CEMENT FINISHER; ENVIRONMENTAL - NUCLEAR, RADIATION, TOXIC & HAZARDOUS WASTE - LEVELS A & B; MINER & DRILLER; TUNNEL B $27.77 $19.66 $47.43 +118% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 4 MINER; & GUNITE NOZZLE PERSON TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO $38.22 $15.95 $54.17 +148% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $24.14 $9.06 $33.20 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $24.39 $9.06 $33.45 Above median +52% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $20.73 $9.06 $29.79 +36% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER $23.39 $9.06 $32.45 +48% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $23.89 $9.06 $32.95 +50% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $43.30 $27.40 $70.70 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 AIR COMPRESSOR ON STEEL ERECTION; BARRIER MOVING MACHINE; BOILER OPERATOR ON COMPRESSOR OR GENERATOR WHEN MOUNTED ON $44.14 $16.41 $60.55 Bottom 10% +121% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT PAVER; AUTOMATIC SUBGRADER MACHINE, SELF-PROPELLED; BOBCAT TYPE AND/OR SKID STEER LOADER WITH HOE ATTACHMENT $44.02 $16.41 $60.43 Bottom 10% +120% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME; AIR COMPRESSOR ON TUNNEL WORK; ASPHALT PLANT ENGINEER; BOBCAT-TYPE AND/OR SKID STEER LOADER WITH OR WITHOUT $42.98 $16.41 $59.39 Bottom 10% +117% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 BACKFILLER; BALLAST RE-LOCATOR; BARS, JOINT & MESH INSTALLING MACHINE; BATCH PLANT; BORING MACHINE OPERATOR; BULL FLO $41.80 $16.41 $58.21 +112% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 5 COMPRESSOR; DRUM FIREPERSON; GENERATOR; MASONRY FORK LIFT; INBOARD-OUTBOARD MOTOR BOAT LAUNCH; MASONRY FORK LIFT; OIL $36.34 $16.41 $52.75 +92% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 6 MASTER MECHANIC & BOOM FROM 150 TO 180 $45.14 $16.41 $61.55 Bottom 10% +124% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 7 BOOM FROM 180 AND OVER $45.14 $16.41 $61.55 Bottom 10% +124% vs market $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATION TECHNICIAN $27.20 $14.54 $41.74 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 Mobile Batch Truck Tender $15.85 $4.60 $20.45 Bottom 10% -23% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 Greaser; Tire Changer; & Mechanic Tender $16.29 $4.60 $20.89 Bottom 10% -22% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pendleton, KY — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Pendleton

Compliance Notes

Full Davis-Bacon compliance guide →