Building Construction — Muhlenberg, Kentucky

WD KY20260041-16812-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Muhlenberg, Kentucky (construction type: building) is $30.00/hr base + $20.89/hr fringe = $50.89/hr total package (WD KY20260041-16812-bld, Rev. 1).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: KY20260041-16812-bld
Revision: 1
Construction Type: building
State: Kentucky (KY)
County: Muhlenberg
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference KY20260041View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $30.00 $20.89 $50.89 +133% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.85 $28.44 $72.29 +105% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.70 $16.57 $50.27 +68% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $31.35 $21.67 $53.02 +117% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $24.46 $9.07 $33.53 +37% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $20.97 $12.01 $32.98 Top 10% +35% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.49 $9.01 $32.50 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.75 $19.14 $55.89 +95% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC $55.63 $37.89 $93.52 Above median +347% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $31.32 $16.53 $47.85 +101% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $32.86 $19.44 $52.30 +119% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $35.63 $26.49 $62.12 +89% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $36.21 $26.42 $62.63 Above median +90% vs market $0.00 $0.00 $0.00 $0.00
LABORER $25.96 $18.10 $44.06 Above median +102% vs market $0.00 $0.00 $0.00 $0.00
LABORER $26.21 $18.10 $44.31 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.16 $17.55 $45.71 Above median +110% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $21.05 $8.09 $29.14 Above median +34% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $25.64 $17.06 $42.70 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $18.73 $10.60 $29.33 Above median +35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $28.53 $17.38 $45.91 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
LABORER: POWER TOOL OPERATOR $26.73 $16.72 $43.45 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $35.54 $29.13 $64.67 +105% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $27.30 $10.73 $38.03 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $24.64 $13.00 $37.64 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $40.05 $19.10 $59.15 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $24.33 $13.00 $37.33 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $34.29 $23.95 $58.24 Above median +165% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $20.19 $11.33 $31.52 +44% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $44.26 $20.28 $64.54 +115% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $34.99 $19.60 $54.59 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $1.00 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING $41.98 $19.60 $61.58 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $41.98 $19.60 $61.58 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $22.31 $7.41 $29.72 +30% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.32 $25.66 $65.98 Above median +179% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $44.15 $26.08 $70.23 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $17.67 $7.45 $25.12 +13% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $25.77 $6.10 $31.87 +44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.07 $6.25 $23.32 Above median -13% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Muhlenberg, KY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Muhlenberg

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KY20260041-16812-bld →