Heavy Construction — McLean, Kentucky

WD KY20260074-16811-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in McLean, Kentucky (construction type: heavy) is $33.89/hr base + $24.06/hr fringe = $57.95/hr total package (WD KY20260074-16811-hvy, Rev. 1).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: KY20260074-16811-hvy
Revision: 1
Construction Type: heavy
State: Kentucky (KY)
County: McLean
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference KY20260074View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $33.89 $24.06 $57.95 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.10 $20.03 $57.13 +100% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $25.46 $17.49 $42.95 +30% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND REINFORCING $36.17 $25.80 $61.97 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, CONCRETE WORKER, GRADE CHECKER & GROUTING $28.94 $17.59 $46.53 +113% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE FINISHING $29.45 $18.77 $48.22 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW, JACK HAMMER & PIPELAYER $29.19 $17.59 $46.78 +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $35.52 $14.45 $49.97 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $29.81 $13.00 $42.81 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $40.05 $19.10 $59.15 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $24.34 $13.00 $37.34 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $20.21 $13.00 $33.21 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRENCHER $26.34 $12.58 $38.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $ $38.37 $19.60 $57.97 Above median $0.00 $0.00 $0.00 $0.00
OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $ $41.55 $19.60 $61.15 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; COMPRESSOR; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER SHALL RECEI $38.69 $19.60 $58.29 +113% vs market $0.00 $0.00 $0.00 $0.00
RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH $39.14 $19.60 $58.74 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.69 $6.20 $22.89 Above median -14% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the McLean, KY — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in McLean

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KY20260074-16811-hvy →