Heavy Construction — Jefferson, Kentucky

WD KY20260072-15314-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Jefferson, Kentucky (construction type: heavy) is $33.89/hr base + $24.06/hr fringe = $57.95/hr total package (WD KY20260072-15314-hvy, Rev. 1).

Scroll down for all 28 trade classifications covered by this determination.

WD Number: KY20260072-15314-hvy
Revision: 1
Construction Type: heavy
State: Kentucky (KY)
County: Jefferson
Effective: May 17, 2026
Trades covered: 28
Official source: SAM.gov reference KY20260072View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $33.89 $24.06 $57.95 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.96 $22.44 $63.40 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $25.46 $17.49 $42.95 +30% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND REINFORCING $36.17 $25.80 $61.97 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BACKFILLER $19.64 $10.08 $29.72 +36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BLASTER, TUNNEL; CONCRETE FINISHING & POWDERMAN $29.84 $17.59 $47.43 +118% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CARPENTER TENDER & CONCRETE WORKER & SIGNAL MAN $28.94 $17.59 $46.53 +113% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CHIPPING GUNS & VIBRATING PLATE $27.12 $19.66 $46.78 +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $19.30 $10.40 $29.70 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $35.69 $14.45 $50.14 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $35.52 $14.45 $49.97 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FORM-STRIPPING, GRADE CHECKER $26.87 $19.66 $46.53 +113% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $27.87 $0.00 $27.87 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT OPERATOR $35.64 $20.39 $56.03 Bottom 10% +53% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $29.70 $18.66 $48.36 +32% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS $38.69 $15.25 $53.94 Bottom 10% +48% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: TRUCK DRIVER FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRIS $16.93 $9.77 $26.70 -27% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $26.76 $13.00 $39.76 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $24.60 $15.64 $40.24 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $40.05 $19.10 $59.15 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $26.50 $13.00 $39.50 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $25.81 $13.00 $38.81 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $23.39 $13.00 $36.39 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRENCHER $26.34 $12.58 $38.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $ $38.69 $19.60 $58.29 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 OILER; PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVE $38.37 $19.60 $57.97 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH $41.55 $19.60 $61.15 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.80 $4.06 $20.86 Above median -22% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Jefferson, KY — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Jefferson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KY20260072-15314-hvy →