The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Hardin, Kentucky (construction type: building) is $26.83/hr base + $12.67/hr fringe = $39.50/hr total package (WD KY20260091-15311-bld, Rev. 1).

Scroll down for all 36 trade classifications covered by this determination.

WD Number: KY20260091-15311-bld
Revision: 1
Construction Type: building
State: Kentucky (KY)
County: Hardin
Effective: May 17, 2026
Trades covered: 36
Official source: SAM.gov reference KY20260091View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $26.83 $12.67 $39.50 Bottom 10% +81% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $43.85 $28.44 $72.29 +105% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $24.24 $8.25 $32.49 +9% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $22.19 $12.25 $34.44 +41% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $21.72 $13.52 $35.24 +44% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $25.77 $7.40 $33.17 +36% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND METAL STUD INSTALLATION, FORMWORK AND FLOOR LAYING - VINYL $23.54 $9.10 $32.64 +33% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: FLOOR LAYING-VINYL ONLY $29.99 $1.32 $31.31 +28% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.21 $9.70 $29.91 +25% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.96 $22.44 $63.40 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $36.17 $25.80 $61.97 +88% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $37.77 $23.90 $61.67 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.86 $5.22 $24.08 Above median +10% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $19.24 $3.79 $23.03 Above median +6% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $26.89 $13.32 $40.21 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $20.36 $9.90 $30.26 Above median +39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: POWER TOOL OPERATOR $26.89 $13.32 $40.21 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $24.35 $13.00 $37.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.49 $3.84 $25.33 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $22.52 $4.00 $26.52 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $23.60 $12.65 $36.25 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $20.83 $11.84 $32.67 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $22.81 $11.87 $34.68 +58% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $41.90 $24.89 $66.79 Above median +123% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $41.90 $24.89 $66.79 Above median +123% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $40.65 $19.60 $60.25 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $34.99 $19.60 $54.59 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING $40.65 $19.60 $60.25 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $40.65 $19.60 $60.25 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $40.65 $19.60 $60.25 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $20.61 $5.12 $25.73 +12% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.32 $25.66 $65.98 Above median +179% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $44.15 $26.08 $70.23 Above median +134% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $15.42 $5.63 $21.05 -5% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $22.64 $6.10 $28.74 +30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $23.60 $8.03 $31.63 Top 10% +18% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hardin, KY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hardin

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KY20260091-15311-bld →