Highway Construction — Fulton, Kentucky

WD KY20260040-14707-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Fulton, Kentucky (construction type: highway) is $33.70/hr base + $16.57/hr fringe = $50.27/hr total package (WD KY20260040-14707-hwy, Rev. 1).

Scroll down for all 56 trade classifications covered by this determination.

WD Number: KY20260040-14707-hwy
Revision: 1
Construction Type: highway
State: Kentucky (KY)
County: Fulton
Effective: May 17, 2026
Trades covered: 56
Official source: SAM.gov reference KY20260040View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $33.70 $16.57 $50.27 +68% vs market $0.00 $0.00 $0.00 $0.00
CABLE SPLICER (FULTON COUNTY) $28.85 $15.50 $44.35 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $33.89 $24.02 $57.91 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
DIVER $51.21 $24.02 $75.23 Above median $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.96 $22.44 $63.40 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $34.92 $14.75 $49.67 +74% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (BALLARD, CALDWELL, CALLOWAY, CARLISLE, CHRISTIAN, CRITTENDEN, FULTON, GRAVES, HICKMAN, LIVINGSTON, LYON, MARSHALL, MCCRACKEN & TRIGG COUN $36.75 $10.29 $47.04 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (FULTON COUNTY) $28.60 $15.49 $44.09 Top 10% +54% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN CABLE SPICERS RECEIVE $.25 PER HOUR ADDITIONAL $37.10 $20.03 $57.13 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL; ORNAMENTAL; REINFORCING; PRECAST CONCRETE ERECTORS (BUTLER COUNTY; EDMONSON COUNTY) $36.17 $25.80 $61.97 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: (ALLEN, LOGAN, SIMPSON, TODD & WARREN COUNTIES BUTLER COUNTY; CHRISTIAN COUNTY; EDMONSON COUNTY; MUHLENBERG COUNTY (SOUTHERN EIGHTH $35.32 $16.44 $51.76 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: (DAVIESS, HANCOCK, HENDERSON, HOPKINS, MCLEAN, OHIO, UNION & WEBSTER COUNTIES BUTLER COUNTY; CALDWELL COUNTY; CHRISTIAN COUNTY; CRITT $35.34 $26.40 $61.74 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS:: ALL OTHER WORK (BALLARD, CALLOWAY, CARLISLE, FULTON, GRAVES, HICKMAN, LIVINGSTON, LYON, MARSHALL, MCCRACKEN & TRIGG COUNTIES CALDWEL $35.63 $26.49 $62.12 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS:: PROJECTS WITH A TOTAL CONTRACT COST OF $20,000,000.00 OR ABOVE (BALLARD, CALLOWAY, CARLISLE, FULTON, GRAVES, HICKMAN, LIVINGSTON, LYON $37.47 $26.49 $63.96 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 AGING & CURING OF CONCRETE; ASBESTOS ABATEMENT WORKER; ASPHALT PLANT; ASPHALT; BATCH TRUCK DUMP; CARPENTER TENDER; CEMENT MASON TEND $26.87 $19.66 $46.53 Above median +113% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 AGING & CURING OF CONCRETE; ASBESTOS ABATEMENT WORKER; ASPHALT PLANT; ASPHALT; BATCH TRUCK DUMP; CARPENTER TENDER; CEMENT MASON TEND $28.55 $18.77 $47.32 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 BATTER BOARD MAN; BRICKMASON TENDER; MORTAR MIXER OPERATOR; SCAFFOLD BUILDER; BURNER & WELDER; BUSHAMMER; CHAIN SAW OPERATOR; CONCRE $27.12 $19.66 $46.78 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 BATTER BOARD MAN; BRICKMASON TENDER; MORTAR MIXER OPERATOR; SCAFFOLD BUILDER; BURNER & WELDER; BUSHAMMER; CHAIN SAW OPERATOR; CONCRE $28.80 $18.77 $47.57 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 ASPHALT LUTEMAN & RAKER; GUNNITE NOZZLEMAN; GUNNITE OPERATOR & MIXER; GROUT PUMP OPERATOR; BLASTER; SIDE RAIL SETTER; RAIL PAVED DIT $27.17 $19.66 $46.83 Bottom 10% +115% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 ASPHALT LUTEMAN & RAKER; GUNNITE NOZZLEMAN; GUNNITE OPERATOR & MIXER; GROUT PUMP OPERATOR; BLASTER; SIDE RAIL SETTER; RAIL PAVED DIT $28.85 $18.77 $47.62 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 CAISSON WORKER; CEMENT FINISHER; ENVIRONMENTAL - NUCLEAR, RADIATION, TOXIC & HAZARDOUS WASTE - LEVELS A & B; MINER & DRILLER; TUNNEL $27.77 $19.66 $47.43 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 CAISSON WORKER; CEMENT FINISHER; ENVIRONMENTAL - NUCLEAR, RADIATION, TOXIC & HAZARDOUS WASTE - LEVELS A & B; MINER & DRILLER; TUNNEL $29.45 $18.77 $48.22 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: ALL OTHER WORK $31.77 $20.30 $52.07 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: ALL OTHER WORK $30.62 $20.30 $50.92 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: ALL OTHER WORK $30.37 $20.30 $50.67 +131% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: ALL OTHER WORK $29.62 $20.30 $49.92 Bottom 10% +128% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: ALL OTHER WORK SPRAY, BLAST, STEAM, HIGH & HAZARDOUS AND ALL EPOXY - $1.00 PREMIUM $34.47 $21.77 $56.24 Top 10% +156% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRIDGES $36.77 $21.77 $58.54 Top 10% +167% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRIDGES $35.00 $20.30 $55.30 Above median +152% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRIDGES $31.77 $20.30 $52.07 +137% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRIDGES $30.77 $20.30 $51.07 Bottom 10% +133% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRIDGES WATERBLASTING UNITS WITH 3500 PSI AND ABOVE - $.50 PREMIUM SPRAYPAINTING AND ALL ABRASIVE BLASTING - $1.00 PREMIUM WORK 40 FT. AND A $31.50 $15.60 $47.10 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER $18.50 $11.97 $30.47 Bottom 10% +39% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY, SANDBLAST, POWER TOOLS, WATERBLAST & STEAM CLEANING $19.50 $11.97 $31.47 Top 10% +43% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $34.39 $24.02 $58.41 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $38.41 $22.26 $60.67 +102% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER; STEAMFITTER $44.26 $20.28 $64.54 Bottom 10% +115% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER; STEAMFITTER $41.90 $24.89 $66.79 Above median +123% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 A-FRAME WINCH TRUCK; AUTO PATROL; BACKFILLER; BATCHER PLANT; BITUMINOUS PAVER; BITUMINOUS TRANSFER MACHINE; BOOM CAT $41.55 $19.60 $61.15 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 AIR COMPRESSOR; BITUMINOUS MIXER; BOOM TYPE TAMPING MACHINE; BULL FLOAT; CONCRETE MIXER; DREDGE ENGINEER; ELECTRIC VI $38.69 $19.60 $58.29 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 ALL OFF ROAD MATERIAL HANDLING EQUIPMENT, INCLUDING ARTICULATING DUMP TRUCKS; GREASER ON GREASE FACILITIES SERVICING $39.14 $19.60 $58.74 Top 10% +114% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 BITUMINOUS DISTRIBUTOR; BURLAP & CURING MACHINE; CEMENT GUN; CONCRETE SAW; CONVEYOR; DECKHAND OILER; GROUT PUMP; HYDR $38.37 $19.60 $57.97 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
SPRAYPAINTING AND ALL ABRASIVE BLASTING - $1.00 PREMIUM WORK 40 FT. AND ABOVE GROUND LEVEL - $1.00 PREMIUM $25.25 $15.60 $40.85 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 1 GREASER, TIRE CHANGER $27.35 $27.81 $55.16 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 1 GREASER, TIRE CHANGER $25.72 $27.81 $53.53 Bottom 10% +100% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 2 TRUCK MECHANIC $27.58 $27.81 $55.39 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 2 TRUCK MECHANIC $25.90 $27.81 $53.71 Bottom 10% +101% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 3 SINGLE AXLE DUMP; FLAT BED; ALL TERRAIN VEHICLE WHEN USED TO HAUL MATERIALS; SEMI TRAILER OR POLE TRAILER WHEN USED TO PULL BUILD $27.65 $27.81 $55.46 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 3 SINGLE AXLE DUMP; FLAT BED; ALL TERRAIN VEHICLE WHEN USED TO HAUL MATERIALS; SEMI TRAILER OR POLE TRAILER WHEN USED TO PULL BUILD $25.90 $27.81 $53.71 Bottom 10% +101% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 4 EUCLID AND OTHER HEAVY EARTH MOVING EQUIPMENT; LOW BOY; ARTICULATOR CAT; 5 AXLE VEHICLE; WINCH AND A- FRAME WHEN USED IN TRANSPOR $27.66 $27.81 $55.47 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 4 EUCLID AND OTHER HEAVY EARTH MOVING EQUIPMENT; LOW BOY; ARTICULATOR CAT; FIVE AXLE VEHICLE; WINCH AND A-FRAME WHEN USED IN TRANSP $25.98 $27.81 $53.79 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 5 MIXER ALL TYPES $26.00 $27.81 $53.81 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: ZONE 1 $26.00 $27.81 $53.81 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: ZONE 1 $26.98 $27.81 $54.79 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: ZONE 1 $25.90 $27.81 $53.71 +101% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: ZONE 1 $25.72 $27.81 $53.53 Bottom 10% +100% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Fulton, KY — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Fulton

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KY20260040-14707-hwy →