Heavy Construction — Elliott, Kentucky

WD KY20260060-16998-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Elliott, Kentucky (construction type: heavy) is $33.89/hr base + $24.06/hr fringe = $57.95/hr total package (WD KY20260060-16998-hvy, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: KY20260060-16998-hvy
Revision: 1
Construction Type: heavy
State: Kentucky (KY)
County: Elliott
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference KY20260060View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $33.89 $24.06 $57.95 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $21.60 $10.35 $31.95 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.35 $2.18 $34.53 +21% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $35.63 $26.49 $62.12 +89% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $37.47 $26.49 $63.96 +94% vs market $0.00 $0.00 $0.00 $0.00
LABORER: AIRTRACK DRILLER $27.77 $19.66 $47.43 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $21.36 $9.39 $30.75 Above median +41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $27.12 $19.66 $46.78 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE WORKER $26.87 $19.66 $46.53 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $18.31 $8.89 $27.20 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $20.15 $8.92 $29.07 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT OPERATOR $39.15 $17.58 $56.73 +55% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $25.77 $14.10 $39.87 Bottom 10% +9% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $43.84 $18.80 $62.64 Bottom 10% +71% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $25.97 $10.25 $36.22 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $30.35 $0.00 $30.35 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 BULLDOZER; CRANE; DRILL; GRADER/BLADE; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER SHALL RECEI $41.55 $19.60 $61.15 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER SHALL RECEIVE $1.00 ABOVE GR $38.69 $19.60 $58.29 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 OILER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCL $38.37 $19.60 $57.97 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Elliott, KY — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Elliott

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KY20260060-16998-hvy →