Heavy Construction — Butler, Kentucky

WD KY20260081-16800-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Butler, Kentucky (construction type: heavy) is $33.89/hr base + $24.06/hr fringe = $57.95/hr total package (WD KY20260081-16800-hvy, Rev. 1).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: KY20260081-16800-hvy
Revision: 1
Construction Type: heavy
State: Kentucky (KY)
County: Butler
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference KY20260081View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $33.89 $24.06 $57.95 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $37.10 $20.03 $57.13 +100% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $25.46 $17.49 $42.95 +30% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND REINFORCING $36.17 $25.80 $61.97 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.52 $6.45 $23.97 Above median +10% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE FINISHING $29.45 $18.77 $48.22 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $29.19 $17.59 $46.78 Above median +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE WORKER $28.94 $17.59 $46.53 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $35.52 $14.45 $49.97 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $25.27 $1.46 $26.73 Above median +23% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $36.75 $10.29 $47.04 Bottom 10% +29% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $23.64 $9.56 $33.20 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $23.31 $9.51 $32.82 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $40.05 $19.10 $59.15 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $22.43 $11.75 $34.18 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $24.34 $13.00 $37.34 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $20.21 $13.00 $33.21 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRENCHER $26.34 $12.58 $38.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $ $38.37 $19.60 $57.97 Above median $0.00 $0.00 $0.00 $0.00
OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $ $38.69 $19.60 $58.29 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 CRANE; DRILL; LOADER; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER SHALL RECEIVE $1.00 ABOVE GROUP 1 RA $41.55 $19.60 $61.15 +123% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.29 $5.95 $22.24 Above median -17% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Butler, KY — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Butler

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KY20260081-16800-hvy →