Heavy Construction — Boyle, Kentucky

WD KY20260059-15257-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CEMENT MASON/CONCRETE FINISHER in Boyle, Kentucky (construction type: heavy) is $21.51/hr base + $10.00/hr fringe = $31.51/hr total package (WD KY20260059-15257-hvy, Rev. 1).

Scroll down for all 14 trade classifications covered by this determination.

WD Number: KY20260059-15257-hvy
Revision: 1
Construction Type: heavy
State: Kentucky (KY)
County: Boyle
Effective: May 17, 2026
Trades covered: 14
Official source: SAM.gov reference KY20260059View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CEMENT MASON/CONCRETE FINISHER $21.51 $10.00 $31.51 Above median +32% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.35 $2.18 $34.53 +21% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $35.63 $26.49 $62.12 +89% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $37.47 $26.49 $63.96 +94% vs market $0.00 $0.00 $0.00 $0.00
LABORER: BACKFILLER, CARPENTER TENDER, COMMON OR GENERAL, CONCRETE WORKER, DUMPMAN & GRADE CHECKER $26.87 $19.66 $46.53 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW, PIPELAYERS & VIBRATING PLATE $27.12 $19.66 $46.78 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $18.31 $8.89 $27.20 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FORM WORKER $28.80 $18.77 $47.57 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $26.42 $12.70 $39.12 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $29.96 $13.00 $42.96 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $25.35 $13.00 $38.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $ $41.55 $9.50 $51.05 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER SHALL RECEIVE $1.00 ABOVE GR $38.69 $9.50 $48.19 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 OILER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCL $38.37 $9.50 $47.87 Above median +75% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Boyle, KY — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Boyle

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KY20260059-15257-hvy →