Highway Construction — Sumner, Kansas

WD KS20260149-15246-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Sumner, Kansas (construction type: highway) is $16.74/hr base + $0.00/hr fringe = $16.74/hr total package (WD KS20260149-15246-hwy, Rev. 1).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: KS20260149-15246-hwy
Revision: 1
Construction Type: highway
State: Kansas (KS)
County: Sumner
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference KS20260149View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $16.74 $0.00 $16.74 -32% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.59 $0.00 $16.59 -32% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.64 $18.29 $58.93 +98% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $16.32 $0.00 $16.32 -30% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $39.00 $34.25 $73.25 Top 10% +213% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $13.03 $0.00 $13.03 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.29 $0.00 $15.29 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $29.21 $14.63 $43.84 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $12.83 $0.00 $12.83 Above median -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $29.75 $12.83 $42.58 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $26.56 $13.05 $39.61 Top 10% +84% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.06 $0.00 $20.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $16.45 $0.00 $16.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $15.49 $0.00 $15.49 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.27 $0.00 $19.27 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $24.26 $0.00 $24.26 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $17.80 $0.00 $17.80 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $22.40 $4.39 $26.79 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $15.55 $0.00 $15.55 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $18.40 $0.00 $18.40 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.13 $0.00 $17.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MATERIAL TRANSFER VEHICLE $17.24 $0.00 $17.24 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $21.18 $0.00 $21.18 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.66 $0.00 $16.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.74 $0.00 $14.74 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROTO MILL $18.53 $0.00 $18.53 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROTO MILL GROUNDMAN $16.36 $0.00 $16.36 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $17.88 $0.00 $17.88 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $16.77 $0.00 $16.77 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: STRIPING MACHINE $27.02 $12.14 $39.16 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $15.97 $0.00 $15.97 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: SERVICE DRIVER $14.13 $0.00 $14.13 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION $16.40 $0.00 $16.40 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP AND TANDEM $16.34 $0.00 $16.34 Above median -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED AND LOWBOY $23.23 $9.89 $33.12 Above median +21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $19.06 $0.00 $19.06 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $21.94 $11.51 $33.45 Above median +22% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sumner, KS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Sumner

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260149-15246-hwy →