Highway Construction — Shawnee, Kansas

WD KS20260148-15177-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Shawnee, Kansas (construction type: highway) is $17.12/hr base + $4.74/hr fringe = $21.86/hr total package (WD KS20260148-15177-hwy, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: KS20260148-15177-hwy
Revision: 1
Construction Type: highway
State: Kansas (KS)
County: Shawnee
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference KS20260148View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $17.12 $4.74 $21.86 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $27.45 $10.10 $37.55 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $29.93 $14.14 $44.07 +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $30.50 $27.05 $57.55 Above median +146% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $39.00 $34.25 $73.25 Top 10% +213% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.30 $8.37 $25.67 Above median +19% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $29.21 $14.63 $43.84 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $13.20 $0.00 $13.20 Above median -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $29.75 $12.83 $42.58 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $32.12 $14.73 $46.85 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $26.78 $11.94 $38.72 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.75 $11.31 $33.06 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $19.17 $0.00 $19.17 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.35 $5.41 $24.76 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $24.26 $0.00 $24.26 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $21.18 $6.96 $28.14 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $25.14 $9.03 $34.17 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $18.87 $4.26 $23.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MATERIAL TRANSFER VEHICLE $14.65 $0.00 $14.65 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $25.45 $9.49 $34.94 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $27.84 $15.53 $43.37 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $16.09 $0.00 $16.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROTO MILL $21.05 $0.00 $21.05 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROTO MILL GROUNDMAN $18.43 $0.00 $18.43 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $17.67 $0.00 $17.67 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $16.93 $0.00 $16.93 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: STRIPING MACHINE $27.27 $12.25 $39.52 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $16.96 $0.00 $16.96 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: SERVICE DRIVER $15.76 $0.00 $15.76 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION $16.54 $0.00 $16.54 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP AND TANDEM $23.23 $11.51 $34.74 Top 10% +27% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED AND LOWBOY $23.82 $9.89 $33.71 Top 10% +23% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF ROAD TRUCK $19.06 $0.00 $19.06 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $22.45 $11.51 $33.96 Above median +24% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Shawnee, KS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Shawnee

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260148-15177-hwy →