Highway Construction — Republic, Kansas

WD KS20260113-15174-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Republic, Kansas (construction type: highway) is $15.59/hr base + $4.17/hr fringe = $19.76/hr total package (WD KS20260113-15174-hwy, Rev. 1).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: KS20260113-15174-hwy
Revision: 1
Construction Type: highway
State: Kansas (KS)
County: Republic
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference KS20260113View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $15.59 $4.17 $19.76 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.93 $0.00 $15.93 -35% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $26.72 $4.22 $30.94 +4% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $14.09 $0.00 $14.09 Bottom 10% -40% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $39.00 $34.25 $73.25 Top 10% +213% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $14.38 $0.00 $14.38 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.15 $0.00 $14.15 Above median -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $14.04 $0.00 $14.04 Above median -35% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PLANT $14.81 $0.00 $14.81 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.97 $2.19 $21.16 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $17.93 $0.00 $17.93 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $13.64 $0.00 $13.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $17.17 $2.37 $19.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $21.11 $0.00 $21.11 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $15.45 $0.00 $15.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.39 $7.66 $27.05 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $15.19 $0.00 $15.19 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $17.89 $1.67 $19.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $15.75 $0.00 $15.75 $0.00 $0.00 $0.00 $0.00
OPERATOR: MATERIAL TRANSFER VEHICLE $13.92 $0.00 $13.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $20.51 $0.00 $20.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $14.90 $0.00 $14.90 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $13.06 $0.00 $13.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROTO MILL $17.74 $0.00 $17.74 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROTO MILL GROUNDMAN $15.35 $0.00 $15.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $15.68 $0.00 $15.68 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $13.94 $0.00 $13.94 $0.00 $0.00 $0.00 $0.00
OPERATOR: STRIPING MACHINE $19.93 $4.49 $24.42 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $15.78 $0.00 $15.78 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: DRILL RIG CAISSONS $38.83 $20.80 $59.63 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
SERVICEMAN: EQUIPMENT $16.33 $1.74 $18.07 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: SERVICE DRIVER $14.55 $0.00 $14.55 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP AND TANDEM $15.79 $0.00 $15.79 Above median -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED AND LOWBOY $19.20 $0.00 $19.20 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF ROAD TRUCK $16.38 $0.00 $16.38 Above median -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: PICKUP TRUCK $16.19 $0.00 $16.19 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $17.07 $0.00 $17.07 Above median -38% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Republic, KS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Republic

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260113-15174-hwy →