Building Construction — Pottawatomie, Kansas

WD KS20260055-15173-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL) in Pottawatomie, Kansas (construction type: building) is $45.60/hr base + $35.47/hr fringe = $81.07/hr total package (WD KS20260055-15173-bld, Rev. 1).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: KS20260055-15173-bld
Revision: 1
Construction Type: building
State: Kansas (KS)
County: Pottawatomie
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference KS20260055View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL) $45.60 $35.47 $81.07 Top 10% +261% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $28.34 $10.33 $38.67 +47% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $28.34 $14.08 $42.42 +71% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 16.31 0.00 CARPENTER $15.08 $0.00 $15.08 -39% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.88 $0.00 $19.88 -18% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $44.05 $20.25 $64.30 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL $60.69 $38.44 $99.13 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $27.22 $21.91 $49.13 Above median +110% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $29.00 $25.35 $54.35 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $36.00 $34.25 $70.25 Top 10% +200% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.19 $1.85 $15.04 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $17.20 $10.27 $27.47 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $17.86 $1.01 $18.87 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $31.56 $11.28 $42.84 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $27.78 $12.58 $40.36 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $33.12 $13.96 $47.08 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $33.19 $14.16 $47.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $37.92 $0.00 $37.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $28.79 $12.73 $41.52 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $26.30 $11.62 $37.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $33.78 $13.64 $47.42 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $36.18 $19.97 $56.15 Above median +160% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $22.07 $0.97 $23.04 +7% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $45.90 $19.94 $65.84 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $45.90 $19.94 $65.84 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $39.93 $22.42 $62.35 Above median +156% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $45.48 $22.42 $67.90 Above median +179% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $22.87 $6.84 $29.71 +30% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $52.18 $27.15 $79.33 Above median +224% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $41.57 $20.60 $62.17 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $29.93 $13.32 $43.25 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER: FIRE SPRINKLER $41.83 $27.60 $69.43 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $20.74 $1.46 $22.20 -17% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $42.73 $18.39 $61.12 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $17.05 $0.00 $17.05 Bottom 10% -38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $39.89 $15.85 $55.74 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $39.89 $15.85 $55.74 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pottawatomie, KS — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Pottawatomie

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260055-15173-bld →