Highway Construction — Ottawa, Kansas
WD KS20260109-15172-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER in Ottawa, Kansas (construction type: highway) is $14.94/hr base + $0.00/hr fringe = $14.94/hr total package (WD KS20260109-15172-hwy, Rev. 1).
Scroll down for all 32 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $14.94 | $0.00 | $14.94 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.94 | $0.00 | $17.94 -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $26.57 | $8.70 | $35.27 +19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM WORKER | $14.13 | $1.57 | $15.70 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $15.38 | $6.92 | $22.30 -5% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $39.00 | $34.25 | $73.25 Top 10% +213% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $14.38 | $0.00 | $14.38 -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.52 | $0.00 | $11.52 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: FLAGGER | $11.59 | $0.00 | $11.59 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ASPHALT PLANT | $14.81 | $0.00 | $14.81 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.32 | $4.13 | $24.45 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.77 | $3.62 | $22.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $15.66 | $0.00 | $15.66 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $17.49 | $2.37 | $19.86 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CONCRETE FINISHING MACHINE | $21.11 | $0.00 | $21.11 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $21.89 | $8.26 | $30.15 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $22.76 | $6.79 | $29.55 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $20.33 | $0.00 | $20.33 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $13.92 | $0.00 | $13.92 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $22.26 | $0.00 | $22.26 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $16.89 | $0.00 | $16.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $14.71 | $0.00 | $14.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROTO MILL | $16.66 | $0.00 | $16.66 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROTO MILL GROUNDMAN | $15.31 | $0.00 | $15.31 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCRAPER | $15.79 | $0.00 | $15.79 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCREED | $16.24 | $0.00 | $16.24 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: STRIPING MACHINE | $19.93 | $4.49 | $24.42 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: SERVICE DRIVER | $13.73 | $0.00 | $13.73 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP AND TANDEM | $18.83 | $0.00 | $18.83 Above median -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLATBED AND LOWBOY | $19.50 | $0.00 | $19.50 Above median -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: OFF ROAD TRUCK | $16.42 | $0.00 | $16.42 Above median -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $17.07 | $0.00 | $17.07 Above median -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Ottawa, KS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Ottawa
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Ottawa, Kansas.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.