Heavy Construction — Ness, Kansas

WD KS20260037-15225-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Ness, Kansas (construction type: heavy) is $17.67/hr base + $1.62/hr fringe = $19.29/hr total package (WD KS20260037-15225-hvy, Rev. 1).

Scroll down for all 14 trade classifications covered by this determination.

WD Number: KS20260037-15225-hvy
Revision: 1
Construction Type: heavy
State: Kansas (KS)
County: Ness
Effective: May 17, 2026
Trades covered: 14
Official source: SAM.gov reference KS20260037View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $17.67 $1.62 $19.29 -22% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.67 $0.00 $13.67 -44% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $44.05 $20.25 $64.30 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $29.99 $13.91 $43.90 +88% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.06 $0.00 $13.06 Above median -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.13 $1.30 $15.43 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.84 $3.97 $22.81 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.75 $0.00 $16.75 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $28.00 $0.00 $28.00 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.17 $0.00 $16.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $15.68 $0.00 $15.68 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $15.90 $0.00 $15.90 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $18.03 $0.78 $18.81 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.70 $3.58 $19.28 Above median -30% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Ness, KS — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Ness

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260037-15225-hvy →