Residential Construction — Miami, Kansas

WD KS20260009-15699-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for AIR CONDITIONING MECHANIC in Miami, Kansas (construction type: residential) is $9.35/hr base + $0.00/hr fringe = $9.35/hr total package (WD KS20260009-15699-res, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: KS20260009-15699-res
Revision: 1
Construction Type: residential
State: Kansas (KS)
County: Miami
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference KS20260009View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
AIR CONDITIONING MECHANIC $9.35 $0.00 $9.35 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $11.57 $0.00 $11.57 Bottom 10% -56% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $8.62 $0.00 $8.62 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $8.06 $0.00 $8.06 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL INSTALLER $10.60 $1.20 $11.80 Top 10% -49% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL TAPER $11.89 $0.63 $12.52 -46% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $8.19 $0.00 $8.19 Bottom 10% -72% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $8.41 $0.00 $8.41 -57% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: SHEET FLOOR LAYERS $9.64 $0.00 $9.64 -51% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GENERAL $7.25 $0.00 $7.25 Top 10% -66% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: MASON TENDERS $7.60 $0.00 $7.60 Top 10% -65% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $7.25 $0.00 $7.25 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $9.70 $0.00 $9.70 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $9.37 $0.00 $9.37 Above median -61% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $7.25 $0.00 $7.25 Bottom 10% -70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GRADER $7.25 $0.00 $7.25 Bottom 10% -70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: LOADER $7.25 $0.00 $7.25 Bottom 10% -70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCRAPER $9.95 $0.00 $9.95 Above median -59% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $11.60 $1.64 $13.24 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $7.25 $0.00 $7.25 Bottom 10% -74% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Miami, KS — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Miami

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260009-15699-res →