Highway Construction — Linn, Kansas

WD KS20260142-15698-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Linn, Kansas (construction type: highway) is $43.28/hr base + $21.25/hr fringe = $64.53/hr total package (WD KS20260142-15698-hwy, Rev. 1).

Scroll down for all 39 trade classifications covered by this determination.

WD Number: KS20260142-15698-hwy
Revision: 1
Construction Type: highway
State: Kansas (KS)
County: Linn
Effective: May 17, 2026
Trades covered: 39
Official source: SAM.gov reference KS20260142View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $43.28 $21.25 $64.53 Above median +160% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $29.45 $14.08 $43.53 +76% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $28.92 $15.80 $44.72 Above median +84% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $29.93 $14.14 $44.07 +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $39.00 $34.25 $73.25 Above median +213% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR $37.45 $15.87 $53.32 +148% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.68 $1.63 $20.31 Above median -6% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $37.45 $15.87 $53.32 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $13.20 $0.00 $13.20 Above median -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $29.75 $12.83 $42.58 Above median +98% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $32.12 $14.73 $46.85 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT OPERATOR $32.15 $15.06 $47.21 Bottom 10% -4% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $26.76 $12.71 $39.47 Bottom 10% -20% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN $41.52 $17.56 $59.08 Bottom 10% +20% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $35.23 $15.53 $50.76 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $33.35 $14.10 $47.45 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $28.15 $11.65 $39.80 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $24.26 $0.00 $24.26 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SAW $33.87 $15.16 $49.03 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $30.38 $11.08 $41.46 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $29.66 $12.55 $42.21 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $32.46 $14.14 $46.60 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MATERIAL TRANSFER VEHICLE $14.65 $0.00 $14.65 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $32.25 $15.31 $47.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $32.88 $15.53 $48.41 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $29.00 $11.40 $40.40 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROTO MILL GROUNDMAN $18.43 $0.00 $18.43 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $17.67 $0.00 $17.67 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $17.38 $3.52 $20.90 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: STRIPING MACHINE $27.27 $12.25 $39.52 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $24.28 $0.00 $24.28 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER $40.17 $22.29 $62.46 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROTO MILL $40.17 $22.29 $62.46 +157% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: SERVICE DRIVER $18.72 $7.52 $26.24 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION $17.10 $0.00 $17.10 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP AND TANDEM $29.04 $12.45 $41.49 Top 10% +52% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED AND LOWBOY $27.96 $14.05 $42.01 Top 10% +53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF ROAD TRUCK $19.06 $0.00 $19.06 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $38.04 $15.85 $53.89 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Linn, KS — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Linn

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260142-15698-hwy →