Building Construction — Leavenworth, Kansas

WD KS20260053-15697-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL) in Leavenworth, Kansas (construction type: building) is $45.60/hr base + $35.47/hr fringe = $81.07/hr total package (WD KS20260053-15697-bld, Rev. 1).

Scroll down for all 41 trade classifications covered by this determination.

WD Number: KS20260053-15697-bld
Revision: 1
Construction Type: building
State: Kansas (KS)
County: Leavenworth
Effective: May 17, 2026
Trades covered: 41
Official source: SAM.gov reference KS20260053View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL) $45.60 $35.47 $81.07 Top 10% +261% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $43.57 $23.02 $66.59 Above median +153% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $43.28 $21.25 $64.53 Above median +160% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $44.63 $22.40 $67.03 Above median +170% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $40.94 $21.25 $62.19 Above median +151% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $30.00 $1.62 $31.62 +28% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $25.93 $11.62 $37.55 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $51.01 $26.25 $77.26 Above median +160% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $32.91 $18.15 $51.06 +72% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC A. VACATION PAY: 6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL $60.69 $38.44 $99.13 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $39.32 $22.34 $61.66 Above median +152% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $25.49 $12.95 $38.44 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $28.44 $11.60 $40.04 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $12.48 $0.00 $12.48 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $31.25 $18.25 $49.50 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $17.86 $1.01 $18.87 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $31.99 $16.03 $48.02 +123% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $33.85 $13.87 $47.72 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $33.53 $13.66 $47.19 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $33.12 $13.96 $47.08 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $30.35 $12.04 $42.39 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $32.18 $13.49 $45.67 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $36.18 $19.97 $56.15 Above median +160% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $36.18 $19.97 $56.15 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $55.56 $25.80 $81.36 Above median +169% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $37.92 $18.83 $56.75 Above median +123% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $54.28 $23.79 $78.07 Above median +159% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $47.29 $22.42 $69.71 Top 10% +187% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $44.14 $22.42 $66.56 Top 10% +174% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $45.48 $22.42 $67.90 Above median +179% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $39.93 $22.42 $62.35 Above median +156% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $45.48 $22.42 $67.90 Above median +179% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $38.45 $22.29 $60.74 Above median +167% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $52.18 $27.15 $79.33 Above median +224% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 38.39 17.73 PAINTER $23.69 $9.39 $33.08 +35% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $40.74 $22.15 $62.89 +108% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $20.74 $1.46 $22.20 -17% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $42.73 $18.39 $61.12 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $28.58 $11.22 $39.80 Above median +45% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $39.89 $15.85 $55.74 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $39.89 $15.85 $55.74 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Leavenworth, KS — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Leavenworth

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260053-15697-bld →