Heavy Construction — Kearny, Kansas

WD KS20260022-15211-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Kearny, Kansas (construction type: heavy) is $17.00/hr base + $1.94/hr fringe = $18.94/hr total package (WD KS20260022-15211-hvy, Rev. 1).

Scroll down for all 12 trade classifications covered by this determination.

WD Number: KS20260022-15211-hvy
Revision: 1
Construction Type: heavy
State: Kansas (KS)
County: Kearny
Effective: May 17, 2026
Trades covered: 12
Official source: SAM.gov reference KS20260022View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $17.00 $1.94 $18.94 -24% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $44.05 $20.25 $64.30 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $29.99 $13.91 $43.90 +88% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.46 $1.23 $13.69 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.13 $1.30 $15.43 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.67 $3.85 $22.52 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.75 $0.00 $16.75 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $28.00 $0.00 $28.00 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.17 $0.00 $16.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $15.68 $0.00 $15.68 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $18.03 $0.78 $18.81 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.70 $3.58 $19.28 Above median -30% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Kearny, KS — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Kearny

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for KS20260022-15211-hvy →